MaintainX, an Autodesk company
EnterprisePricing
Vulcan

Vulcan Heavy Duty Gas Griddle ASA60

Need answers fast?
Explore the manual using AI.

Vulcan Heavy Duty Gas Griddle ASA60
Vulcan Heavy Duty Gas Griddle ASA60

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Vulcan Heavy Duty Gas Griddle ASA60

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Vulcan Heavy Duty Gas Griddle ASA60

Vulcan Heavy Duty Gas Griddle ASA60

Create an account to install this asset package.

Maintenance Plans for Vulcan Heavy Duty Gas Griddle Model ASA60

Integrate maintenance plans directly into your work orders in MaintainX.

Gas Pressure Measurement Service

Check mark

Safety Precautions

Check mark

Check all gas joints disturbed during servicing for leaks using a soap and water solution.

Check mark

Preparation

Check mark

Turn the gas supply off at a manual shutoff valve.

Check mark

Remove the control panel.

Check mark

Pressure Measurement

Check mark

Remove the pressure tap plug and attach manometer.

Check mark

Turn gas back on.

Check mark

Light pilot(s).

Run this procedureArrow right

Electric Igniter Replacement

Check mark

WARNING! Disconnect the electrical power to the machine and follow lockout / tagout procedures

Check mark

Remove FRONT PANEL

Check mark

Release igniter from frame and pull out of unit

Check mark

Label and disconnect wires from electric igniter

Check mark

Install igniter in reverse order

Check mark

Check that all parts are in place

Check mark

Test the igniter functionality

Check mark

Clean the work area

Run this procedureArrow right

Thermostat Valve Assembly Replacement

Check mark

Safety Precautions

Check mark

Disconnect the electrical power to the machine and follow lockout / tagout procedures

Check mark

Shut off the gas before servicing the unit and follow lockout / tagout procedures

Check mark

Check all gas joints disturbed during servicing for leaks using a soap and water solution

Check mark

Thermostat Valve Assembly Replacement Steps

Check mark

Remove FRONT PANEL

Check mark

Disconnect gas line

Check mark

Remove screws securing thermostat mounting bracket to frame

Check mark

Pull capillary tube out from underneath griddle plate

Run this procedureArrow right

Thermocouple Testing

Check mark

Thermocouple Installation

Check mark

Unscrew thermocouple fitting from safety valve

Check mark

Install thermocouple test adapter finger tight plus a quarter turn

Check mark

Install thermocouple into test adapter finger tight plus a quarter turn

Check mark

Voltage Measurement Setup

Check mark

Set VOM to DC millivolt scale

Check mark

Connect (+) meter lead to pin on thermocouple adapter and (-) meter lead to thermocouple

Check mark

Pilot Flame Adjustment

Check mark

Light pilot flame

Run this procedureArrow right

Burner Adjustment

Check mark

Initial Setup

Check mark

Ensure the burner is turned off and cool before starting adjustments.

Check mark

Air Shutter Adjustment

Check mark

Loosen the screw on the venturi.

Check mark

Adjust the air shutter to eliminate yellow tips on the burner flames.

Check mark

Tighten the screw to lock the air shutter in place.

Check mark

Final Check

Check mark

Is the flame blue and stable after adjustment?

Check mark

Repeat the procedure for all burners if necessary.

Run this procedureArrow right

Parts for Vulcan Heavy Duty Gas Griddle ASA60

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Aluminum Foil Tape

7631421

Adapter

H23-226

Aluminum Foil Tape

7631421

Adapter

H23-226

Aluminum Foil Tape

7631421

Adapter

H23-226

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Vulcan

Explore Other Assets