MaintainX Asset Hub logo
EnterprisePricing
Urschel Laboratories

Urschel Laboratories Dicer Machine GK-A

Need answers fast?
Explore the manual using AI.

Urschel Laboratories Dicer Machine GK-A
Urschel Laboratories Dicer Machine GK-A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Urschel Laboratories Dicer Machine GK-A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Urschel Laboratories Dicer Machine GK-A

Urschel Laboratories Dicer Machine GK-A

Create an account to install this asset package.

Maintenance Plans for Urschel Laboratories Dicer Machine Model GK-A

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Dicer Machine Cleaning

Check mark

Warning: Only qualified trained personnel should clean the machine. Never use abrasives, metal tools, wire brushes or sandpaper to clean any parts. Scrape with wooden or plastic tools if necessary.

Check mark

Clean outside of machine with water

Check mark

Flush product from cutting parts. Direct a stream of water or cleaning solution into feed opening while machine is running

Check mark

Warning: Make certain that all covers and guards are in place while machine is running! Maintain a safe distance from machine. Do not insert hose or cleaning tools into feed opening!

Check mark

Stop the machine. Disconnect and lock out power source. Thoroughly wash all sheet metal covers.

Check mark

Remove and disassemble all cutting parts. The dicing unit can be lifted from the operating position and lowered to the maintenance position. This position simplifies cleaning, inspection and repair. When lowering the dicing unit into the operating position, carefully turn and mesh the gears as the unit settles into position.

Check mark

The dicing unit should always be fastened in place with the hand knobs before the machine is operated. Remove and disassemble all cutting parts. Rinse cutting parts thoroughly with water or appropriate cleaning solution. If cleaning solutions are used, rinse thoroughly with water.

Check mark

Clean remaining portion of machine. A forceful stream of water will remove most of the product. Use cleaning solutions when necessary and rinse thoroughly.

Check mark

Sign off on the machine cleaning

Run this procedureArrow right

4 Hourly Cover / Guard Lubrication

Check mark

RECOMMENDED LUBRICANT: Use a food grade lubricant that is non-toxic, sanitary and approved for incidental food contact. The lubricant recommended for this machine, except motor, is Haynes® Lubri-Film (listed as H-1 by the USDA). Lubricant may be purchased from Urschel Laboratories in spray cans for gears and grease cartridges for bearings. See “Tools’’ , page 69.

Check mark

LUBRICATION POINTS: The machine has a total of seven (7) grease fittings (Figure 20). Lubricate the fittings until grease comes out from around bearings and thrust washers. Lubricate slice adjustment bearing with a drop of oil immediately after machine has been cleaned (Figure 21).

Check mark

Lubrication done every four hours of operating time?

Check mark

22 knife crosscut spindle bearings lubricated every two hours?

Check mark

Lubrication done after cleanup to force cleaning solutions from bearings?

Check mark

Lubrication done after maintenance to replace any grease lost during these procedures?

Check mark

Sign off on the lubrication procedure

Run this procedureArrow right

Bearing Block Replacement

Check mark

Warning: This procedure requires trained personnel with specific tools!

Check mark

If you lack the necessary tools or skills, return the crosscut knife spindles to Urschel Laboratories for repair.

Check mark

Check off the tools you have available

Check mark

Are all necessary tools available?

Check mark

If not all tools are available, stop the procedure and return the spindle to Urschel Laboratories.

Check mark

Was the procedure successful?

Check mark

Describe any issues encountered during the procedure.

Check mark

Sign off on the bearing block replacement

Run this procedureArrow right

Circular Knife Spindle Assembly Inspection

Check mark

All parts should be inspected for serviceability and repaired or replaced if necessary. For information on knife care and sharpening, see page 60 and refer to the “SHARP” bulletin provided with machine.

Check mark

Spacers and Shaft: Check for burrs and hone if necessary, but be careful to remove only the burr.

Check mark

Spindle: Check for burrs and hone if necessary, but be careful to remove only the burr. Inspect thrust sleeves for wear and replace if necessary (see “Reassembly”, page 54).

Check mark

Gear: Inspect gear for wear or damage. Replace if necessary.

Check mark

Knives: Replace any that are bent or have large nicks. Knives should also be replaced if the diameter is less than 3.938" (100 mm) or the serrations are no longer present. See page 60 for more information on knife care.;

Run this procedureArrow right

Circular Knife Spindle Disassembly

Check mark

Remove circular knife spindle

Check mark

Clamp spindle in a soft jaw vise at gear end

Check mark

Do not clamp vise onto gear

Check mark

Use spindle wrench to remove nut, turning counterclockwise

Check mark

Carefully slide knives and spacers off spindle

Check mark

Upload a photo of the disassembled spindle

Check mark

Sign off on the spindle disassembly

Run this procedureArrow right

Parts for Urschel Laboratories Dicer Machine GK-A

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Actuator

63741

Adapter, Fuse

13673

Adapter Plate

63747

Adjustment Knob, For Slice Gate

13218

Adjustment Nut, Slice Gate.

13220

Actuator

63741

Adapter, Fuse

13673

Adapter Plate

63747

Adjustment Knob, For Slice Gate

13218

Adjustment Nut, Slice Gate.

13220

Actuator

63741

Adapter, Fuse

13673

Adapter Plate

63747

Adjustment Knob, For Slice Gate

13218

Adjustment Nut, Slice Gate.

13220

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

Explore Other Assets