

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

J&J Amusements Go-Kart Eagle
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Axle Cover Removal
Remove the engine (see page 8-1).
Remove the axle cover shoulder bolts.
ALWAYS MAKE SURE ALL SAFETY RELATED DECALS ARE LEGIBLE. REPLACE IF NECESSARY. WARNING DECAL (TO PREVENT INJURY OR DEATH) # 1-60-0388
Remove the wheel and fender.
Lift the rear of the axle cover and pull the cover away from both the center and wheel clips.
Remover the axle cover.
Sign off on the axle cover removal
Basic Integrity Fuel Tank Shall Consist Test
Warning: This test requires trained personnel with PPE!
Special cap installed on the fuel tank
Fuel shut-off at the carburetor closed
Vent lines closed (if fitted)
Low-pressure air regulator attached to shop air supply
Pressure control knob turned counter-clockwise to minimize pressure
Air pressure regulator installed on the test cap
Tank pressurized to 3 psi using the control knob
Air supply shut off via the ball valve on the regulator
Battery Pack Replacement
Turn the kart off and remove the battery covers or kart body to access the batteries.
< WARNING > Carefully remove the negative cable. Be sure to not allow the wrench to touch the positive and negative lugs of the battery at the same time.
NOTE: Always remove the negative cable first and attach it last when removing or replacing any battery or performing any electric service.
Negative cable removed first?
Hold-down brackets removed?
Sign off on the battery pack replacement
Battery Pack Test
LOAD-TESTING THE BATTERY PACK WITH DIGITAL VOLT-OHM METER (DVOM)
The normal full-charge, open-circuit voltage reading for the battery pack will be approximately 52vdc. As a quick test, hook your DVOM with the min/max feature selected (if available). Drive the go-kart one lap or more, making sure to fully load the system with a brief, maximum acceleration and/or by sliding the go-kart along the track’s safety rail at full acceleration to “load” the battery pack.
If the pack is good, typical minimum voltage readings will be in the 47-48 volt range. Anything less requires immediate further testing (see testing individual batteries).
LOAD TESTING INDIVIDUAL BATTERIES WITH DVOM
This procedure requires a DVOM with a min/max feature. This will memorize the maximum voltage and the minimum voltage readings attained, as long as this feature is activated.
Attach the leads to the battery to be tested; secure the meter and drive a lap around the track. Fully accelerate to put maximum load on the battery, sliding the go-kart along the track rail for a few seconds with the full throttle applied. After the test lap, check the minimum voltage reading attained; a good battery will not go below 9.6vdc. If you get a lower reading, the battery has failed the test and must be replaced.
NOTE: Placing a failed battery on a separate, slow charger may bring it back.;
Bearing Removal
Warning: This procedure requires trained personnel with PPE!
Lock tabs pushed up from the sleeve jam nut index slots
Sleeve jam nut loosened with a spanner wrench. J&J # 1-60-0193
Bearing/sleeve assembly broken loose using a brass hammer and J&J bearing removal tool # 3-96-0104
NOTE: Be careful not to hit the axle with the hammer. A brass hammer is best for this procedure.
Bearing assembly removed as a whole or jam nut and lock ring removed separately
Bearing removed from the tapered sleeve; sleeve removed from the axle
Sign off on the bearing removal
Access the parts list for your equipment in MaintainX.
12" Side Extensions
10728
13" Front Extension
16011
8" Side Extensions
10730
All-Metal Replacement
2090017METAL.
Bead Breaker
3-96-A0001
12" Side Extensions
10728
13" Front Extension
16011
8" Side Extensions
10730
All-Metal Replacement
2090017METAL.
Bead Breaker
3-96-A0001
12" Side Extensions
10728
13" Front Extension
16011
8" Side Extensions
10730
All-Metal Replacement
2090017METAL.
Bead Breaker
3-96-A0001
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













