MaintainX, an Autodesk company
EnterprisePricing
Teledyne CETAC Technologies

Teledyne CETAC Technologies Oven ACCQPrep SFC

Need answers fast?
Explore the manual using AI.

Teledyne CETAC Technologies Oven ACCQPrep SFC
Teledyne CETAC Technologies Oven ACCQPrep SFC

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Teledyne CETAC Technologies Oven ACCQPrep SFC

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Teledyne CETAC Technologies Oven ACCQPrep SFC

Teledyne CETAC Technologies Oven ACCQPrep SFC

Create an account to install this asset package.

Maintenance Plans for Teledyne CETAC Technologies Oven Model ACCQPrep SFC

Integrate maintenance plans directly into your work orders in MaintainX.

Column Select Valve Rotor Replacement

Check mark

Check for Accessory Kit (PN 605269011)

Check mark

Vent the system pressure

Check mark

Select TOOLS > MANUAL CONTROL > VENT SYSTEM PRESSURE

Check mark

Wait for at least 15 minutes for the instrument to depressurize

Check mark

Monitor the System and BPR pressure reading in the System Status Bar

Check mark

Turn off the power to the system

Check mark

Access the column oven module

Check mark

Loosen the rotor cap using a 5/8" open-faced wrench

Check mark

Finish removing the rotor cap by hand

Run this procedureArrow right

Oven Maintenance

Check mark

As Needed Maintenance

Check mark

Perform cleaning as per Section 5.1.1

Check mark

Perform quick flow cell cleaning when recommended by a system alert message as per Section 5.4

Check mark

Every Run Maintenance

Check mark

Allow the separation run to finish with a high percentage of co-solvent to flush residual compounds from the column, internal tubing, and flow cell

Check mark

Allow the sample probe wash to run to completion to wash residual compounds from the sample line

Run this procedureArrow right

Oven Cleaning

Check mark

Exterior Surface Cleaning

Check mark

Use a cleaning cloth dampened with a mixture of distilled water and mild detergent to clean the exterior surfaces.

Check mark

Use isopropyl alcohol for tougher stains.

Check mark

Printed Areas Care

Check mark

Avoid rubbing vigorously on printed areas such as labels.

Check mark

Do not use aggressive solvents like acetone on printed areas.

Check mark

Safety Precautions

Check mark

Do not immerse the instrument in a water bath.

Check mark

Avoid subjecting the instrument to a liquid spray.

Run this procedureArrow right

1 Monthly Tubing Inspection

Check mark

Visual Inspection of Tubing

Check mark

Inspect the following tubing for damage, kinks, or deterioration

Check mark

Check fittings for signs of leaks

Check mark

Pump Module Inspection

Check mark

Check pumps at the front of the pump module for leaks

Check mark

Check pumps at the front of the pump module for frosting

Check mark

Check pumps at the front of the pump module for condensation

Check mark

Back-side Tubing Inspection

Check mark

Inspect back-side tubing for leaks

Run this procedureArrow right

1 Weekly Oven Maintenance

Check mark

Chiller Liquid Level Check

Check mark

Measure the chiller liquid level

Check mark

Is the chiller liquid level adequate?

Check mark

Chiller Temperature Check

Check mark

Check the chiller temperature on the LCD display

Check mark

Is the chiller cold?

Check mark

Chiller Flow Check

Check mark

Is the chiller flow adequate?

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Teledyne CETAC Technologies

Explore Other Assets