

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Teledyne CETAC Technologies Autosampler ASX-7000
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Autosampler Maintenance
Safety Precautions
Discharge static buildup and ground to the autosampler base or cabinet before performing maintenance.
Avoid touching bare wires or connectors.
Parts Replacement
Replace the following parts that wear out under normal use
Vial Requirements
Ensure the purchased sample and/or standards vials meet the following requirements
Ordering Supplies
Refer to the CETAC Accessories and Supplies Catalog for ordering additional supplies.
1 Weekly Autosampler Cleaning
Preparation
Shut down and unplug the autosampler
Cleaning the Autosampler
Remove the sample tray
Wipe loose particles off the Y-Axis lead screw with a dry, lint-free cloth
Wipe the autosampler exterior and base until they are clean
Pay special attention to the Y-axis slider block and guide rails
Cleaning the Sample Tray
Wash the sample tray in a warm detergent solution
Peristaltic Pump Tubing Replacement
Preparation
Shut down the autosampler
Unplug the autosampler
Remove Old Tubing
Release the pressure shoe
Remove the old tubing
Was the old tubing removed without cutting?
Install New Tubing
Push the new tubing onto the fittings
Rinse Station Tubing Replacement
Preparation
Shut down and unplug the autosampler
Move the autosampler arm 20 to 30 centimeters away from the home position
Tubing Disconnection
Disconnect the rinse agent uptake and drain tubing
Apply only a linear force when removing the tubing to prevent fittings from breaking
Remove Old Tubing
Rotate the rinse station tube counterclockwise ¼ turn
Lift the tube straight up
1 Daily Autosampler Cleaning
Preparation
Shut down the autosampler
Unplug the autosampler
Cleaning Process
Wipe the sample tray with a towel dampened with laboratory-grade cleaning liquid
Wipe the autosampler cabinet with a towel dampened with laboratory-grade cleaning liquid
Wipe the autosampler arm with a towel dampened with laboratory-grade cleaning liquid
Ensure cleaning liquid does not touch the lead screws
Wipe the sample tray with a towel dampened with clear water
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













