MaintainX Logo
EnterprisePricing
Skyjack

Skyjack Articulating Boom Lifts SJ85 AJ

Need answers fast?
Explore the manual using AI.

Skyjack Articulating Boom Lifts SJ85 AJ
Skyjack Articulating Boom Lifts SJ85 AJ

The Skyjack Articulating Boom Lift SJ85 AJ is a versatile and robust aerial work platform designed for high-reach applications. Known for its reliability and ease of use, this model offers exceptional maneuverability and safety features, making it ideal for construction and maintenance tasks in various industrial environments.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Skyjack Articulating Boom Lifts SJ85 AJ

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Skyjack Articulating Boom Lifts SJ85 AJ

Skyjack Articulating Boom Lifts SJ85 AJ

Create an account to install this asset package.

Maintenance Plans for Skyjack Articulating Boom Lifts Model SJ85 AJ

Integrate maintenance plans directly into your work orders in MaintainX.

200 Daily / 200 Hourly Base Maintenance

Check mark

Base Weldment: No cracks or deformation.

Check mark

Base Electrical Panel: Correctly attached and no damage. Tight wire connections and fasteners.

Check mark

Axles: Correctly attached and no missing components. Tight fittings and hoses and no leaks. Make sure the axles and drive shaft are lubricated.

Check mark

Electric Drive Motor: Correctly attached and no damage. Tight wire connections and fasteners.

Check mark

Steer Assembly: Correctly attached and no missing components. Tight fittings and hoses. No leaks, damage, or wear.

Check mark

Torque Hubs: Correctly attached and no damage or missing components. Tight fittings, hoses, and bolts. No leaks.

Check mark

Wheel Motors: Correctly attached. No damage or missing components.

Check mark

Wheel/Tire Assembly: Do a check of all tires for damage, wear, and correctly aligned.

Check mark

Sign off on the 200 Daily / 200 Hourly Base Maintenance

Run this procedureArrow right

200 Daily / 200 Hourly Boom Maintenance

Check mark

Rotary Actuator(s): No damage or missing components. Tight fittings, hoses, and bolts and no leaks.

Check mark

Jib: No damage or missing components. Tight hoses and bolts and no leaks.

Check mark

Boom: No damage or missing components. No deformation or cracks in welds. Tight fittings, hoses, bolts, and pins. No leaks.

Check mark

Cable Track: No damage or missing components.

Check mark

Wear Pads: No damage, wear, or missing components. Fasteners tight.

Check mark

Riser: No damage or missing components. No deformation or cracks in welds. Tight fittings, hoses, bolts, and pins. No leaks.

Check mark

Cylinders: No damage or missing components. Tight fittings and hoses and no leaks. Pins and bushing are tight and correctly installed.

Check mark

Control Cables and Hoses: No damage or missing components. No leaks.

Check mark

Wire Ropes: No damage or missing components. Tight jam nuts. No spring gaps.

Run this procedureArrow right

200 Daily / 200 Hourly Articulating Boom Lifts Inspection

Check mark

Service Bulletins: No open service bulletins

Check mark

Annual Inspection: Completed within 13 months

Check mark

Labels: In place, correctly attached & readable

Check mark

Limit Switches: Correctly installed and no obstructions or damage

Check mark

Special Options and Approved Attachments: Correctly attached and no damage or missing components

Check mark

Function Tests: Refer to the operating manual for your serial number for information on how to do these tests

Check mark

Sign off on the inspection

Run this procedureArrow right

200 Daily / 200 Hourly Platform Maintenance

Check mark

Railings and Gate: Correctly attached and no damage or missing components.

Check mark

Platform Floor: Correctly attached and no damage or missing components.

Check mark

Footswitch: Correctly attached. Operates correctly with no modifications.

Check mark

Fall-Protection Anchorage: Anchorages are correctly attached and no damage.

Check mark

AC Power Socket: No obstructions, dirt, or damage.

Check mark

Platform Control Console: Operate the switches and make sure they all operate correctly. No damage or missing components.

Check mark

Manual Storage Box: Manuals and documents are in storage box, in good condition, and you can read them.

Check mark

Sign off on the platform maintenance

Run this procedureArrow right

200 Daily / 200 Hourly Engine/Hydraulic/Battery/Electrical Compartments Maintenance

Check mark

Main Power Disconnect Switch: Cables and switch tight and in working order.

Check mark

Battery Trays: Trays and covers are latched tightly and no missing components.

Check mark

Batteries: No damage, tight connections, and sufficient fluid levels if necessary. Clean terminals and cable ends.

Check mark

Battery Charger: Correctly attached and no damage.

Check mark

Base Control Console: Operate the switches and make sure they all operate correctly. No damage or missing components.

Check mark

Emergency Power Unit: Tight fittings and hoses and no damage or leaks. Tight wire connections, no missing components.

Check mark

Manifolds: Tight fittings and hoses and no damage or leaks. Tight wire connections, no missing components, and correctly working valves.

Check mark

Hydraulic Tank: Filler cap closed tightly and no damage or leaks.

Check mark

Hydraulic Return Filter: Correctly attached and no damage, missing components, or leaks.

Run this procedureArrow right

Parts for Skyjack Articulating Boom Lifts SJ85 AJ

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Valve, Boom Up

168758

Valve, Differential Lock

159827

Valve, 2-Speed

159827

Valve, Flow Enable Platform/Jib

168755

Valve, Dump

102626

Valve, Boom Up

168758

Valve, Differential Lock

159827

Valve, 2-Speed

159827

Valve, Flow Enable Platform/Jib

168755

Valve, Dump

102626

Valve, Boom Up

168758

Valve, Differential Lock

159827

Valve, 2-Speed

159827

Valve, Flow Enable Platform/Jib

168755

Valve, Dump

102626

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Skyjack

Explore Other Assets