MaintainX Logo
EnterprisePricing
Skyjack

Skyjack Articulating Boom Lifts SJ30 ARJE

Need answers fast?
Explore the manual using AI.

Skyjack Articulating Boom Lifts SJ30 ARJE
Skyjack Articulating Boom Lifts SJ30 ARJE

The Skyjack Articulating Boom Lift SJ30 ARJE is a versatile and reliable aerial work platform designed for optimal performance in various industrial applications. Known for its compact design and exceptional reach, this boom lift ensures safety and efficiency on job sites, making it a preferred choice among operators and maintenance teams.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Skyjack Articulating Boom Lifts SJ30 ARJE

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Skyjack Articulating Boom Lifts SJ30 ARJE

Skyjack Articulating Boom Lifts SJ30 ARJE

Create an account to install this asset package.

Maintenance Plans for Skyjack Articulating Boom Lifts Model SJ30 ARJE

Integrate maintenance plans directly into your work orders in MaintainX.

200 Daily / 200 Hourly Platform Maintenance

Check mark

Railings and Gate correctly attached and no damage or missing components

Check mark

Platform Floor correctly attached and no damage or missing components

Check mark

Footswitch correctly attached and operates correctly with no modifications

Check mark

Fall-Protection Anchorage correctly attached and no damage

Check mark

AC Power Socket has no obstructions, dirt, or damage

Check mark

Platform Control Console switches operate correctly with no damage or missing components

Check mark

Manuals and documents are in storage box, in good condition, and readable

Check mark

Sign off on the platform maintenance

Run this procedureArrow right

1 Yearly Articulating Boom Lifts Maintenance

Check mark

Hydraulic Filter checked and changed if necessary

Check mark

Turret Rotation Motor/Gear lubricated

Check mark

No loose bolts in Wheel/Tire Assembly

Check mark

Wheel nuts torqued as recommended

Check mark

Wear Pads clearance is correct

Check mark

Hydraulic oil sample test result

Check mark

Note: Take these samples when the oil is warmed through normal operation of the system.

Check mark

Note: Have the sample analyzed by a qualified lubrication specialist to determine if it is suitable for continued use.

Check mark

Note: Oil change intervals depend on the care used to keep the oil clean, and the operating conditions.

Run this procedureArrow right

200 Daily / 200 Hourly Control Compartment Maintenance

Check mark

Base Control Console: Operate the switches and make sure they all operate correctly. No damage or missing components.

Check mark

Main Manifold: Tight fittings and hoses and no damage or leaks.

Check mark

Main Manifold: Tight wire connections, no missing components and correctly working valves.

Check mark

Sign off on the control compartment maintenance

Run this procedureArrow right

200 Daily / 200 Hourly Motor/Hydraulic Compartment Maintenance

Check mark

Hydraulic Tank: Filler cap closed tightly and no damage or leaks.

Check mark

Hydraulic Filter: Correctly attached and no damage, missing components or leaks.

Check mark

Hydraulic Pump/Motor: Tight fittings and hoses and no damage or leaks. No damage, missing components or leaks.

Check mark

Hydraulic Oil: Level between min. and max. marks.

Check mark

Emergency Power Unit: Tight fittings and hoses and no damage or leaks. Tight wire connections, no missing components.

Check mark

Turret Rotation Motor/Gear: Tight fittings, hoses and bolts. No damage, missing components or leaks. Make sure the gears are lubricated.

Check mark

Sign off on the motor/hydraulic compartment maintenance

Run this procedureArrow right

200 Daily / 200 Hourly Articulating Boom Lifts Inspection

Check mark

Service Bulletins: No open service bulletins

Check mark

Annual Inspection: Completed within 13 months

Check mark

Labels: In place, correctly attached & readable

Check mark

Limit Switches: Correctly installed & no obstructions or damage

Check mark

Special Options and Approved Attachments: Correctly attached and no damage or missing components

Check mark

Sign off on the inspection

Run this procedureArrow right

Parts for Skyjack Articulating Boom Lifts SJ30 ARJE

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Valve, Counterbalance (Jib Elevation)

149372

Cylinder, Main Boom Lift

192073

Valve, Counterbalance (Platform Level)

209153

Cylinder, Master

192076

Cylinder, Slave (Platform Levelling)

192077

Valve, Counterbalance (Jib Elevation)

149372

Cylinder, Main Boom Lift

192073

Valve, Counterbalance (Platform Level)

209153

Cylinder, Master

192076

Cylinder, Slave (Platform Levelling)

192077

Valve, Counterbalance (Jib Elevation)

149372

Cylinder, Main Boom Lift

192073

Valve, Counterbalance (Platform Level)

209153

Cylinder, Master

192076

Cylinder, Slave (Platform Levelling)

192077

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Skyjack

Explore Other Assets