MaintainX Asset Hub logo
EnterprisePricing
Rite-Hite

Rite-Hite High Speed Door Fastrax FR LD

Need answers fast?
Explore the manual using AI.

Rite-Hite High Speed Door Fastrax FR LD
Rite-Hite High Speed Door Fastrax FR LD

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Rite-Hite High Speed Door Fastrax FR LD

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Rite-Hite High Speed Door Fastrax FR LD

Rite-Hite High Speed Door Fastrax FR LD

Create an account to install this asset package.

Maintenance Plans for Rite-Hite High Speed Door Model Fastrax FR LD

Integrate maintenance plans directly into your work orders in MaintainX.

12 Monthly High Speed Door Maintenance

Check mark

Controls/Wiring

Check mark

All connections clean and checked with disconnect off

Check mark

All wires are free from moving parts

Check mark

Door Assembly

Check mark

Visual inspection for damage performed

Check mark

All hardware tightened

Check mark

Any worn labels replaced

Check mark

Dust and debris removed using air hose

Check mark

Door Operation

Run this procedureArrow right

1 Monthly Operation Verification

Check mark

Warning: Only Rite‑Hite authorized service technicians should change the programming.

Check mark

NOTE: Advise pedestrians to use man doors if present and not to lean into the door way.

Check mark

Open the control box and look at the row of (X) green Input LEDs on the i‑COMM 3 and the label to verify proper state.

Check mark

Check and remedy: Pillow block bearing set screws tightened to 66 to 80in/lb [7.5Nm].

Check mark

Check and remedy: Wires are connected for the photoeyes.

Check mark

Check and remedy: All loose wires are secured away from moving parts.

Check mark

With the power on, press the “OPEN” button, the door should open and close automatically after a short delay.

Check mark

Operate and observe the door opening to make sure that it fully opens. Observe the closing action to make sure that the door operates smoothly, and fully closes without excessive curtain ripple. Black edging of curtain should not impact the floor.

Check mark

While the door is closing, block the reversing photoeyes. The door should reverse direction, move to the open position, and continue to operate.

Run this procedureArrow right

6 Monthly High Speed Door Maintenance

Check mark

Curtain fans are powered and working

Check mark

Curtain fans are positioned properly and are removing condensation from the curtain

Check mark

Auto re-feed is operational

Check mark

Curtain inspected for wear or damage

Check mark

Upload a photo of the patched curtain

Check mark

Drive spheres checked and replaced if missing or damaged

Check mark

Top roller checked

Check mark

Perimeter Seal (FR) is free of tears and providing an adequate seal against curtain and the wall

Check mark

Upload a photo of the patched Perimeter Seal (FR)

Run this procedureArrow right

Drive Sphere Replacement

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Type of adhesive used for the procedure

Check mark

Adhesive applied to curtain edge drive sphere stud?

Check mark

Adhesive applied to stud before tightening?

Check mark

Adhesive oozed out both sides after stud is tightened?

Check mark

Enter the time taken for adhesive to dry

Check mark

Enter the torque applied

Check mark

Sign off on the drive sphere replacement

Run this procedureArrow right

Encoder Replacement

Check mark

Unscrew connector

Check mark

Loosen lock collar (C) using 2mm Allen wrench and slide encoder off of shaft (A)

Check mark

Install new encoder and tighten lock collar (14in-lb. [1.5Nm])

Check mark

Line up notch and screw connector

Check mark

Proceed to 'Limit (Encoder) Set-up' on page 68

Check mark

Sign off on the encoder replacement

Run this procedureArrow right

Parts for Rite-Hite High Speed Door Fastrax FR LD

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

575V 3Ph Curtain Fan

13250090

Adapter, Rs-485, M Series

10300019

Aero Lubriplate

54650001

Bearing, Flange, 1In Bore

12500034

Block,Mnt,Nord Arm,Dfndr

13000065

575V 3Ph Curtain Fan

13250090

Adapter, Rs-485, M Series

10300019

Aero Lubriplate

54650001

Bearing, Flange, 1In Bore

12500034

Block,Mnt,Nord Arm,Dfndr

13000065

575V 3Ph Curtain Fan

13250090

Adapter, Rs-485, M Series

10300019

Aero Lubriplate

54650001

Bearing, Flange, 1In Bore

12500034

Block,Mnt,Nord Arm,Dfndr

13000065

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Rite-Hite

Explore Other Assets