MaintainX Asset Hub logo
EnterprisePricing
Rite-Hite

Rite-Hite Leveler DD20126.5

Need answers fast?
Explore the manual using AI.

Rite-Hite Leveler DD20126.5
Rite-Hite Leveler DD20126.5

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Rite-Hite Leveler DD20126.5

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Rite-Hite Leveler DD20126.5

Rite-Hite Leveler DD20126.5

Create an account to install this asset package.

Maintenance Plans for Rite-Hite Leveler Model DD20126.5

Integrate maintenance plans directly into your work orders in MaintainX.

365 Daily Leveler Maintenance

Check mark

DANGER: Never be under the DUAL-DOK® 2000 platform or lip without:

Check mark

Engaging the support latch by pulling the activation chain and pressing and holding the Lift DOWN button until the platform stops descending, as shown on page iii, Figure A1

Check mark

Pulling the selector valve activation chain out to prevent scissors movement, as shown on page iv, Figure B

Check mark

If lip needs to be extended, follow procedures on page iv, Figure C

Check mark

Turning off power to the control box

Check mark

Locking out and tagging out the main power source, as shown on inside front cover

Check mark

WARNING:

Check mark

Follow all safety procedures of the facility where the DUAL-DOK® 2000 system is installed

Check mark

Place barriers at ground level and dock level indicating that service work is being performed

Run this procedureArrow right

90 Daily Leveler Maintenance

Check mark

DANGER: Never be under the DUAL-DOK® 2000 platform or lip without:

Check mark

Engaging the support latch by pulling the activation chain and pressing and holding the Lift DOWN button until the platform stops descending

Check mark

Pulling the selector valve activation chain out to prevent scissors movement

Check mark

If lip needs to be extended, follow procedures

Check mark

Turning off power to the control box

Check mark

Locking out and tagging out the main power source

Check mark

WARNING: Follow all safety procedures of the facility where the DUAL-DOK® 2000 system is installed.

Check mark

Place barriers at ground level and dock level indicating that service work is being performed.

Check mark

Perform all Daily maintenance procedures.

Run this procedureArrow right

1 Daily Leveler Maintenance

Check mark

DANGER: Never be under the DUAL-DOK® 2000 platform or lip without:

Check mark

Engaging the support latch by pulling the activation chain and pressing and holding the Lift DOWN button until the platform stops descending

Check mark

Pulling the selector valve activation chain out to prevent scissors movement

Check mark

If lip needs to be extended, follow procedures

Check mark

Turning off power to the control box

Check mark

Locking out and tagging out the main power source

Check mark

WARNING:

Check mark

Follow all safety procedures of the facility where the DUAL-DOK® 2000 system is installed

Check mark

Place barriers at ground level and dock level indicating that service work is being performed

Run this procedureArrow right

180 Daily Leveler Maintenance

Check mark

DANGER: Never be under the DUAL-DOK® 2000 platform or lip without:

Check mark

Engaging the support latch by pulling the activation chain and pressing and holding the Lift DOWN button until the platform stops descending

Check mark

Pulling the selector valve activation chain out to prevent scissors movement

Check mark

If lip needs to be extended, follow procedures

Check mark

Turning off power to the control box

Check mark

Locking out and tagging out the main power source

Check mark

WARNING: Follow all safety procedures of the facility where the DUAL-DOK® 2000 system is installed.

Check mark

Place barriers at ground level and dock level indicating that service work is being performed.

Check mark

Perform all Daily and 90 Day maintenance procedures.

Run this procedureArrow right

1 Yearly Hydraulic Fluid Change

Check mark

NOTE: Frequency of maintenance may need to change if equipment is installed in an extremely dusty or hot environment. Use only MIL-H-5606 hydraulic fluid.

Check mark

Normal Usage: Hydraulic Fluid Change

Check mark

8 hours daily: Every 3 years

Check mark

16 hours daily: Every 2 years

Check mark

24 hours daily: Every year

Check mark

1. Engage the safety devices as described in the following Danger.

Check mark

DANGER: Never be under the DUAL-DOK® 2000 platform or lip without:

Check mark

a. Engaging the support latch by pulling the activation chain and pressing and holding the Lift DOWN button until the platform stops descending, as shown on page iii, Figure A1,

Check mark

b. Pulling the selector valve activation chain out to prevent scissors movement, as shown on page iv, Figure B,

Run this procedureArrow right

Parts for Rite-Hite Leveler DD20126.5

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Front Guard Assembly (Includes Bellows)

17791

Bellows

56549

Base Frame

5202

Cotter Pin, 1" Long

51901

Washer, Flat 7/16" I.D. X 13/16" O.D.

51700

Front Guard Assembly (Includes Bellows)

17791

Bellows

56549

Base Frame

5202

Cotter Pin, 1" Long

51901

Washer, Flat 7/16" I.D. X 13/16" O.D.

51700

Front Guard Assembly (Includes Bellows)

17791

Bellows

56549

Base Frame

5202

Cotter Pin, 1" Long

51901

Washer, Flat 7/16" I.D. X 13/16" O.D.

51700

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Rite-Hite

Explore Other Assets