MaintainX Logo
EnterprisePricing
Rite-Hite

Rite-Hite High Performance Modular Door Fastrax FR

Need answers fast?
Explore the manual using AI.

Rite-Hite High Performance Modular Door Fastrax FR
Rite-Hite High Performance Modular Door Fastrax FR

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Rite-Hite High Performance Modular Door Fastrax FR

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Rite-Hite High Performance Modular Door Fastrax FR

Rite-Hite High Performance Modular Door Fastrax FR

Create an account to install this asset package.

Maintenance Plans for Rite-Hite High Performance Modular Door Model Fastrax FR

Integrate maintenance plans directly into your work orders in MaintainX.

12 Monthly High Preformance Modular Door Maintenance

Check mark

Clean, check all connections with disconnect off

Check mark

Make sure all wires are free from moving parts

Check mark

Operate door and make sure all operations are functioning properly

Check mark

Verify drive tube gear is centered over track groove. Make sure bearing set screws and mounting bolts are tight

Check mark

Verify Encoder chain and sprocket set screws are tight. Check open and close positions, adjust as required

Check mark

Verify lintel seal is sealing wall properly

Check mark

Check junction box and plug connections

Check mark

With power off, verify chain hoist opens door. Lubricate chain, sprockets and check alignment

Check mark

Inspect track retention edging, replace if cracked

Run this procedureArrow right

1 Monthly Tracks / Radial Maintenance

Check mark

Perform visual inspection

Check mark

Lubricate radials and tracks with food grade synthetic grease (Super Lube)

Check mark

Is it required to remove the existing grease prior to adding new?

Check mark

Verify proper width and tighten all hardware

Check mark

Check foam seal if present

Run this procedureArrow right

6 Monthly Curtain Maintenance

Check mark

Inspect for wear or damage

Check mark

Patch immediately to prevent condensation or frost buildup

Check mark

Clean with warm soapy water

Check mark

Check drive spheres, if missing or damaged, replace

Check mark

Check top roller

Check mark

Sign off on the curtain maintenance

Run this procedureArrow right

6 Monthly High Preformance Modular Door Maintenance

Check mark

All devices are operating properly

Check mark

Curtain Fans are powered and working

Check mark

Fans are positioned properly and are removing condensation from the curtain

Check mark

Auto re-feed is operational

Check mark

Both photoeyes reverse the curtain

Check mark

LED’s on receiver should go on/off

Check mark

Emitter and receiver lens are clean

Check mark

Air bag is inflated, free of tears and providing an adequate seal against curtain and the wall

Check mark

Warm air existing exhaust holes

Run this procedureArrow right

12 Monthly Door Assembly Maintenance

Check mark

Perform visual inspection for damage

Check mark

Tighten all hardware

Check mark

Replace any worn labels

Check mark

Use air hose to remove dust and debris

Check mark

Sign off on the door assembly maintenance

Run this procedureArrow right

Parts for Rite-Hite High Performance Modular Door Fastrax FR

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Bumper, Rubber, Motor

15250081

Fuse, 1 Amp, 250V, Time Delay

51000002

Fuse, 2 Amp, 250V, Time Delay

51000005

Kit, Drive Sphere

53700561

Photoeye Source

53700702

Bumper, Rubber, Motor

15250081

Fuse, 1 Amp, 250V, Time Delay

51000002

Fuse, 2 Amp, 250V, Time Delay

51000005

Kit, Drive Sphere

53700561

Photoeye Source

53700702

Bumper, Rubber, Motor

15250081

Fuse, 1 Amp, 250V, Time Delay

51000002

Fuse, 2 Amp, 250V, Time Delay

51000005

Kit, Drive Sphere

53700561

Photoeye Source

53700702

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

Explore Other Assets