Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Otto Boge Scroll Compressor EO 22D
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
10000 Hourly/4 Yearly Cooling Air Fan Maintenance
WARNING: Risk of injury due to sharp edges, hot surfaces, overpressure and exposure to dust! This maintenance work should only be carried out by authorised and qualified personnel. Wear PPE.
Switch off the compressor using the OFF button.
Open the mains disconnecting device and secure it to prevent it being switched on again.
Allow all hot compressor components to cool to 50°C.
Depressurise the system.
Remove the right side panel of the housing and the isolating protective equipment.
Remove the V-belts.
Loosen the screws on the scroll compressor fan covers and remove the covers.
Check the fans and clean if necessary.
10000 Hourly/4 Yearly Scroll Compressor Maintenance
10 bar compressor: After 5,000 operating hours but after two years at the latest.
8 bar compressor: After 10,000 operating hours but after four years at the latest.
Have the following maintenance work on the scroll compressors carried out exclusively by BOGE Service personnel.
The following work must be carried out:
– Replace "Tip Seal" sealant on scroll compressor
– Service / lubricate scroll compressor bearing
– Clean cooling fins on scroll compressor.
10000 Hourly/4 Yearly V-Belt Maintenance
WARNING: Risk of injury due to sharp edges, hot surfaces, overpressure and exposure to dust! This maintenance work should only be carried out by authorised and qualified personnel. Wear PPE.
Switch off the compressor using the OFF button.
Open the mains disconnecting device and secure it to prevent it being switched on again.
Allow all hot compressor components to cool to 50°C.
Depressurise the system.
Remove the service side cladding.
Remove the belt protection.
Loosen all four motor fastening screws (2).
Turn the belt tensioning screw (1) anti-clockwise.
15000 Hourly/6 Yearly Scroll Compressor Maintenance
Warning: Scroll compressor replacement should be done exclusively by BOGE Service personnel.
Enter the operating hours of the 10 bar compressor
Has the 10 bar compressor exceeded 15,000 operating hours or six years?
Enter the operating hours of the 8 bar compressor
Has the 8 bar compressor exceeded 20,000 operating hours or eight years?
Sign off on the scroll compressor maintenance
1500 Hourly/6 Monthly Cooler Cleaning
Warning: Risk of injury due to sharp edges, hot surfaces and exposure to dust! This maintenance work should only be carried out by authorised and qualified personnel. Wear PPE.
Note: The service life of the primary and secondary coolers depends on the degree of soiling in the intake cooling air. Heavy external soiling of the coolers leads to an excessively high temperature in the air system.
Switch off the compressor using the OFF button.
Prior to the maintenance work:
Open the mains disconnecting device and secure it to prevent it being switched on again.
Allow all hot compressor components to cool to 50°C.
Remove all the safety claddings necessary for maintenance work.
Open the respective housing panel. Secondary cooler: remove the housing panel above the operating elements / control.
ATTENTION: Danger of property damage! Do not use sharp objects to clean the cooler. They may damage the cooler.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.