

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Montague Refrigerated Chef Base Unit FB-48-SC
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Condenser Coil Maintenance
WARNING: DISCONNECT ELECTRICAL POWER SUPPLY BEFORE CLEANING ANY PART OF THE UNIT
Preparation
Disconnect electrical power supply
Remove louvered panel by lifting it up and pulling the bottom out
Cleaning the Condenser Coil
Clean dirt and lint from the condenser coil using a vacuum cleaner or soft brush
Was an approved condenser degreaser used to remove grease?
Reassembly and Power Restoration
Replace louvered panel by installing top of the panel into track and pushing in the bottom so it fits inside the opening
1 Monthly Condenser Coil Cleaning
Preparation
Ensure the service is performed by an authorized & trained service technician
Remove screws mounting the condensing guard to the condenser cabinet
Remove 3 screws from the condensing unit base (2 in front, 1 at right rear)
Retract the condensing unit from the condenser cabinet on a sliding shelf
Remove the additional right side panel if accessible
Cleaning Process
Remove grille
Use vacuum and soft brush to dislodge and remove dust on and in the coil
1 Monthly Equipment Maintenance
Preparation
Turn the power off to the unit
Remove all product and pans from the base cabinet
Defrosting Process
Leave the unit to set for 24 hours with all of the drawers removed
Cleaning and Reinstallation
Perform the monthly case cleaning
Wipe all surfaces dry
Reinstall the drawers
1 Weekly Condenser Filter Cleaning
Accessing the Condensing Unit
Remove the louvered panel from the front of the unit
Lift access panel up and pull outward to remove
Removing the Condenser Filter
Remove the magnetic condenser filter by pulling the filter framing away from the condenser
Cleaning the Condenser Filter
Clean the condenser filter thoroughly
Do you have an extra condenser filter on hand?
1 Weekly Gasket Inspection
Gasket Inspection
Check for gasket defects
Is the gasket creating a flush seal when the drawers are closed?
Gasket Replacement
Pull drawer open until it stops
Pull back on slide locks on left and right side retractable slides
Lift drawer slightly while pulling back until drawer assembly is removed
Remove gasket by pulling from retaining strip
Install new gasket by snapping lip of gasket into retaining strip of door on all sides
Access the parts list for your equipment in MaintainX.
Drawer Gasket (Large, 28-3/4" Width)
60789-4
Drawer Gasket (Large, 28-3/4" Width)
60789-4
Drawer Gasket (Large, 28-3/4" Width)
60789-4
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













