MaintainX Asset Hub logo
EnterprisePricing
Mazak

Mazak CNC Machine OTN 250MS

Need answers fast?
Explore the manual using AI.

Mazak CNC Machine OTN 250MS
Mazak CNC Machine OTN 250MS

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Mazak CNC Machine OTN 250MS

Mazak CNC Machine OTN 250MS

Create an account to install this asset package.

Maintenance Plans for Mazak CNC Machine Model OTN 250MS

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Coolant Maintenance

Check mark

!CAUTION: When replenishing coolant to the coolant tank, use a rust preventive coolant. Otherwise, corrosion may occur and cause malfunction of the machine.

Check mark

1. Checking the coolant level

Check mark

Check if coolant is stored in the coolant tank to the specified level before starting the day’s operation. If the volume of the coolant supplied from the nozzle becomes low, check the coolant level in the coolant tank if the coolant level is lower than the allowable lower limit.

Check mark

2. Supplying coolant

Check mark

(1) Pull out the coolant tank.

Check mark

(2) Supplying coolant

Check mark

Replenish the coolant that has been arranged to the appropriate density beforehand so that the suction port is completely immersed in the coolant.

Check mark

* Recommended coolant: SOLVAC 1535G (Mobil) / TRIMSOL (Master Chemical) / HYSOL (Castrol)

Check mark

3. Discharging coolant

Run this procedureArrow right

1 Daily Filter Cleaning

Check mark

The filter separates the pump chamber from the coolant tank. It can be removed easily for cleaning.

Check mark

Clean the filter using an air gun.

Check mark

Remove chips from the coolant tank every day after completing the day’s work.

Check mark

Is the filter very much clogged with dirt?

Check mark

If the filter is very much clogged with dirt, replace the filter.

Check mark

When ordering a replacement filter from Mazak Technical Center or Technology Center, refer to the Parts List and specify the part number.

Check mark

Sign off on the daily filter cleaning

Run this procedureArrow right

1 Daily Lubrication Unit Of The Slideway Section Maintenance

Check mark

1. Inspecting the lubrication unit of the slideway section

Check mark

A. Inspecting the lubricating oil amount

Check mark

Before starting the machine every day, check that the lubricating oil reserve tank is filled with the specified lubricating oil to the specified level.

Check mark

If the oil level is lower than the center of the upper/lower level line of the level gauge at the tank side, supply the same brand of lubricating oil from the oil filter port on the upper part of the lubrication unit so that the oil level do not exceed the upper limit level line.

Check mark

B. Cleaning and changing the filter

Check mark

The suction filter in the automatic intermittent lubricating pump can be removed by taking off the screws of the upper part of the pump. The filter on the oil filler port can be removed in the same manner. Clean the filters once in a year.

Check mark

C. Checking lubricating status

Check mark

Before starting the day’s operation, check every lubricating status of the lubricating parts. Shortage of oil in the lubricating parts causes clogging of the flow unit and oil leakage from the piping route.

Check mark

Entry of foreign particles like chips into the flow unit causes clogging and malfunction of the flow unit. In such a case, replace the flow unit.

Run this procedureArrow right

1 Daily Machine Inspection

Check mark

General

Check mark

Arranging the machine periphery in order

Check mark

Cleaning the machine and its periphery (especially, the floor)

Check mark

Headstock

Check mark

Checking the chuck unit and its periphery for chips

Check mark

Checking for secure mounting of the top jaws

Check mark

Checking for smooth chucking/unchucking

Check mark

Greasing the chuck unit

Check mark

Tailstock

Run this procedureArrow right

1 Monthly Machine Inspection

Check mark

1. Headstock:

Check mark

- Removing any chips from the coolant collector.

Check mark

2. Secondary headstock and W-axis:

Check mark

- Cleaning the cooling fan filter.

Check mark

3. Headstock cooling unit:

Check mark

- Cleaning the radiator.

Check mark

4. Coolant unit:

Check mark

- Checking the degree of dirtiness of the coolant and if necessary, replacing.;

Run this procedureArrow right

Parts for Mazak CNC Machine OTN 250MS

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Ce Mark

43116229072

Danger Sign For Terminal Box

33116228032

Fluorescent Bulb Tc-Del 18W

R61VS00142A

General Safety Instructions

25626328232

Integrated Caution Plate

33116228712

Ce Mark

43116229072

Danger Sign For Terminal Box

33116228032

Fluorescent Bulb Tc-Del 18W

R61VS00142A

General Safety Instructions

25626328232

Integrated Caution Plate

33116228712

Ce Mark

43116229072

Danger Sign For Terminal Box

33116228032

Fluorescent Bulb Tc-Del 18W

R61VS00142A

General Safety Instructions

25626328232

Integrated Caution Plate

33116228712

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Mazak

Explore Other Assets