

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Maritime Geothermal Compressor W-180-H-P-4S-PP-01
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Heat Exchangers Maintenance
Initial Assessment
Is there a performance degradation not explained by a refrigeration circuit problem or low loop flow rate?
Loop Disconnection and Flushing
Disconnect the affected loop
Flush heat exchanger with a lime removing solution
System Type Consideration
Select the system type
Is the system a warm water open loop with reduced performance?
LCD Interface Check
Alarm and Fault Inspection
Check for alarms and faults on the LCD interface
Rectify any problems if alarms are found
Control Board Replacement
Turn the power off to the unit
Take a picture of the control board and connectors for reference
Remove all green terminal strips from the left side, right side, and bottom of the control board
Remove the red six pin display board connector from the left side of the control board
Remove all connectors from the top of the control board
Remove the control board from its four corner standoffs
Remove any remaining standoffs from the old control board
Carefully remove the new control board from the static bag
Place any cut off standoffs from the old board into the new board
Compressor Replacement
Pump down the unit
Was there a compressor burn out?
Dispose of refrigerant according to local codes
Disconnect piping
Remove crankcase heater, leaving electrically connected
Replace the compressor
Replace the liquid line filter-dryer
Ensure nitrogen is flowing through the system during brazing
Vacuum the unit
LCD Interface (Display) Board Replacement
Turn the power off to the unit
Remove the display board cable connector from the control board
Slice each of the display board standoff heads off using a sharp utility knife
Pull the display board from the unit
Remove the display board cable connector from the back of the display board
Place a new display board standoff into each of the four holes in the cabinet
Remove the new display board from the static bag it was shipped in
Connect one end of the display board cable to the back of the display board
Place the display board in position and align the four standoffs into the four holes of the board
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













