MaintainX Asset Hub logo
EnterprisePricing
Lochinvar

Lochinvar Condensing Boiler OFL1251

Need answers fast?
Explore the manual using AI.

Lochinvar Condensing Boiler OFL1251
Lochinvar Condensing Boiler OFL1251

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Lochinvar Condensing Boiler OFL1251

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Lochinvar Condensing Boiler OFL1251

Lochinvar Condensing Boiler OFL1251

Create an account to install this asset package.

Maintenance Plans for Lochinvar Condensing Boiler Model OFL1251

Integrate maintenance plans directly into your work orders in MaintainX.

Thermostat Circuit Check

Check mark

Preparation

Check mark

Disconnect the two external wires connected to the enable terminals on the connection board.

Check mark

Voltage Check

Check mark

Connect a voltmeter across the two incoming wires and close each thermostat, zone valve, and relay in the external circuit one at a time. Record the voltmeter reading across the incoming wires.

Check mark

Is there any voltage reading?

Check mark

Troubleshooting

Check mark

If a voltage occurs, was the external wiring checked and corrected?

Check mark

Final Steps

Check mark

Reconnect the external thermostat circuit wires to the connection board.

Run this procedureArrow right

Water Chemistry Check

Check mark

Water Hardness Check

Check mark

Measure the water hardness in grains per gallon

Check mark

Is the water hardness between 5 and 12 grains per gallon?

Check mark

Consult local water treatment companies for hard water areas (above 12 grains per gallon hardness)

Check mark

pH Level Check

Check mark

Measure the pH level of the water

Check mark

Is the pH level between 6.5 and 8.5?

Check mark

Total Dissolved Solids (TDS) Check

Check mark

Measure the Total Dissolved Solids (TDS) in ppm

Run this procedureArrow right

Water System Check

Check mark

Fill and Test Water System

Check mark

Ensure the water meets the requirements of the manual before filling the system.

Check mark

Close automatic and manual air vents and boiler drain valve.

Check mark

Fill to correct system pressure.

Check mark

Enter the minimum cold water fill pressure for the system.

Check mark

Check if the pressure rises when the boiler is turned ON and system water temperature increases.

Check mark

Check the system thoroughly for any leaks during initial fill and boiler startup.

Check mark

Repair all leaks before proceeding further.

Check mark

Purge Air from Water System

Run this procedureArrow right

Gas Valve Replacement

Check mark

Safety Precautions

Check mark

Ensure the gas supply is turned off before starting the procedure.

Check mark

Verify that the area is well-ventilated to prevent gas accumulation.

Check mark

Ensure all ignition sources are removed from the area.

Check mark

Gas Valve Removal

Check mark

Disconnect the flanged connections to the venturi and the blower.

Check mark

Remove the existing gas valve carefully.

Check mark

Gas Valve Installation

Check mark

Install the new gas valve with flanged connections to the venturi and the blower.

Run this procedureArrow right

Vent Piping Check

Check mark

Vent Piping Inspection

Check mark

Check for gastight seal at every connection, seam, and vent piping

Check mark

Is the venting system sealed gastight to prevent flue gas spillage and carbon monoxide emissions?

Check mark

Safety Warning

Check mark

WARNING

Check mark

Acknowledge understanding of the safety warning regarding the importance of a gastight seal to prevent severe personal injury or death.

Run this procedureArrow right

Parts for Lochinvar Condensing Boiler OFL1251

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Outdoor Kit Models 751 - 2001

100301827

Outdoor Kit Models 2501 - 3001

100313289

Outdoor Kit Models 3501

100308477

Outdoor Kit Models 4001 - 5001

100313290

Outdoor Kit Models 6001

100313291

Outdoor Kit Models 751 - 2001

100301827

Outdoor Kit Models 2501 - 3001

100313289

Outdoor Kit Models 3501

100308477

Outdoor Kit Models 4001 - 5001

100313290

Outdoor Kit Models 6001

100313291

Outdoor Kit Models 751 - 2001

100301827

Outdoor Kit Models 2501 - 3001

100313289

Outdoor Kit Models 3501

100308477

Outdoor Kit Models 4001 - 5001

100313290

Outdoor Kit Models 6001

100313291

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Lochinvar

Explore Other Assets