

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Leum Engineering Portable Loading Dock DFC3811422D
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Portable Loading Dock Inspection
Safety Precautions
Lockout/Tagout electrical power according to OSHA regulations
Post safety warnings and barricade work area at dock level and ground level
Ensure maintenance strut is properly installed before working under the leveler
Environmental Considerations
Is the leveler exposed to harsh environments?
Consult Dockzilla Co. for accelerated maintenance requirements if necessary
Was a non-corrosive ice melt product used instead of salt?
Maintenance Tasks
Strut Installation
⚠ WARNING: DO NOT install maintenance strut with 1 person. Installation of the maintenance strut requires 2 people. The maintenance strut is required whenever accessing the area beneath the platform.
Press the RAISE button to fully raise the leveler platform. The RAISE button will remain pressed until step 4 is complete.
⛔ DANGER: DO NOT stand directly in front of the lip when raising the leveler platform. Stand to the side of the leveler.
Insert the narrower end of maintenance strut into the hole in the lip.
Place the other end of the maintenance strut on the peg located on the leveler frame.
Align the hole at the bottom of the maintenance strut with the hole in the peg.
Verify that the bottom of the maintenance strut is seated properly and is approximately vertical.
Release the RAISE button. The platform will lower and will be supported by the maintenance strut.
Install safety pin through peg to hold strut in place.
1 Daily Portable Loading Dock Inspection
Safety Precautions
Lockout/Tagout electrical power according to OSHA regulations
Post safety warnings and barricade work area at dock level and ground level
Ensure maintenance strut is properly installed before working under the leveler
Inspection and Maintenance
Inspect for damaged parts or erratic operation
Were there any broken or worn parts that needed repair?
Remove any debris on or around the leveler
Environmental Considerations
Strut Removal
⚠ WARNING: DO NOT install maintenance strut with 1 person. Installation of the maintenance strut requires 2 people. The maintenance strut is required whenever accessing the area beneath the platform.
MAINTENANCE STRUT REMOVAL
Press the RAISE button to fully raise the leveler platform. The RAISE button will remain pressed until step 2 is complete.
⛔ DANGER: DO NOT stand directly in front of the lip when raising the leveler platform. Stand to the side of the leveler.
Remove the safety pin holding the strut in place and remove the strut from the leveler frame.
Verify nothing is in the way of the leveler platform, release the RAISE button and lower the leveler into its stored position.
Check that all tools and personnel are clear from the area before proceeding.
Confirm that the strut has been successfully removed and stored properly.
Access the parts list for your equipment in MaintainX.
Handrail 72L
HRR38.5T72L14SC
Handrail with extension 72L
DZ1370-72.00
Handrail with extension 40L
DZ1370-40.00
Standard "Curb-hook" Ships Ladder
DZ1180
Impactable Base Plate Weldment (Left)
DZ1299-L
Handrail 72L
HRR38.5T72L14SC
Handrail with extension 72L
DZ1370-72.00
Handrail with extension 40L
DZ1370-40.00
Standard "Curb-hook" Ships Ladder
DZ1180
Impactable Base Plate Weldment (Left)
DZ1299-L
Handrail 72L
HRR38.5T72L14SC
Handrail with extension 72L
DZ1370-72.00
Handrail with extension 40L
DZ1370-40.00
Standard "Curb-hook" Ships Ladder
DZ1180
Impactable Base Plate Weldment (Left)
DZ1299-L
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













