
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

JLG Boom Lift E300AJ
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1200 Hourly / 2 Yearly Boom Lift Maintenance
- Hydraulic Tank Oil Level Change
1. Change oil
NOTE! On new machines, those recently overhauled, or after changing hydraulic oil, operate all systems a minimum of two complete cycles and recheck oil level in reservoir
- Wheel Drive Hub Oil Level Change
1. Change oil
- Wheel Bearing Lubrication
1. Lubricate the wheel bearings;
150 Hourly / 3 Monthly Boom Lift Maintenance
- Swing Bearing Lubrication
NOTICE! LUBRICATION INTERVALS ARE BASED ON MACHINE OPERATION UNDER NORMAL CONDITIONS. FOR MACHINES USED IN MULTI-SHIFT OPERATIONS AND/OR EXPOSED TO HOSTILE ENVIRONMENTS OR CONDITIONS, LUBRICATION FREQUENCIES MUST BE INCREASED ACCORDINGLY
1. Apply grease and rotate in 90 degree intervals until bearing is completely lubricated
- Wheel Drive Hub Oil Level Check
1. Check the oil level
- Torque check
1. Check torque every 3 months or 150 hours of operation;
1 Daily Boom Lift Maintenance
- Hydraulic Tank Oil Level Check
1. Check the oil level
- Battery Charging (page 102)
NOTE: To avoid excessive battery charging time, do not allow batteries to become completely discharged. To avoid electrolyte overflow, add distilled water to batteries after charging. When adding water to the battery, fill only to level indicated or 3/8" above separators
1. Charge batteries at the end of each work day, or when machine performance is significantly reduced due to batteries becoming discharged
2. Charge batteries in accordance with the following procedure
a. Open battery compartment, and battery charger compartment covers
WARNING! WHEN BATTERY CHARGER IS TO BE USED, CHARGING HARNESS MUST BE PLUGGED INTO A GROUNDED RECEPTACLE. IF RECEPTACLE IS NOT GROUNDED AND A MALFUNCTION SHOULD OCCUR, THE MACHINE COULD CAUSE SERIOUS ELECTRICAL SHOCK
b. Remove charging harness cable and connect to a receptacle or the correct voltage
3 Monthly Battery Maintenance
WARNING! TO AVOID INJURY FROM AN EXPLOSION, DO NOT SMOKE OR ALLOW SPARKS OR A FLAME NEAR BATTERY DURING SERVICING. ALWAYS WEAR EYE AND HAND PROTECTION WHEN SERVICING BATTERIES
CAUTION! WHEN ADDING WATER TO BATTERIES, ADD WATER UNTIL ELECTROLYTE COVERS PLATES. DO NOT CHARGE BATTERIES UNLESS ELECTROLYTE COVERS THE PLATES
NOTE: When adding distilled water to batteries, non-metallic containers and/or funnels must be used. To avoid electrolyte overflow, add distilled water to batteries after charging. When adding water to the battery, fill only to level indicated or 3/8\ (9.5 mm) above separators"
Open battery compartment cover to allow access to battery terminals and vent caps
Remove all vent caps and inspect electrolyte level of each cell. Electrolyte level should be to the ring approximately one inch from top of battery. Fill batteries with distilled water only. Replace and secure all vent caps
Remove battery cables from each battery post one at a time, negative first. Clean cables with acid neutralizing solution (e.g. baking soda and water or ammonia) and wire brush. Replace cables and/or cable clamp bolts as required
Clean battery post with wire brush then re-connect cable to post. Coat non-contact surfaces with mineral grease or petroleum jelly
When all cables and terminal posts have been cleaned, ensure all cables are properly positioned and do not get pinched. Close battery compartment cover
Start hydraulic system and ensure that it functions properly
Initial 50 Hours Boom Lift Maintenance
- Hydraulic Return Filter Change
1. Change the filter when Boom Lift is new
- Wheel Nut torque
1. Wheel nuts should be torqued after first 50 hours of operation and after each wheel removal;
Access the parts list for your equipment in MaintainX.
Bearing Grease Mobilith SHA 460
3020029
Bearing Grease Mobilith SHA 460
3020029
Bearing Grease Mobilith SHA 460
3020029
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













