MaintainX Asset Hub logo
EnterprisePricing
Ingersoll Rand

Ingersoll Rand Rotary Screw Air Compressor R11i-200 TAS

Need answers fast?
Explore the manual using AI.

Ingersoll Rand Rotary Screw Air Compressor R11i-200 TAS
Ingersoll Rand Rotary Screw Air Compressor R11i-200 TAS

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Ingersoll Rand Rotary Screw Air Compressor R11i-200 TAS

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ingersoll Rand Rotary Screw Air Compressor R11i-200 TAS

Ingersoll Rand Rotary Screw Air Compressor R11i-200 TAS

Create an account to install this asset package.

Maintenance Plans for Ingersoll Rand Rotary Screw Air Compressor Model R11i-200 TAS

Integrate maintenance plans directly into your work orders in MaintainX.

4000 Hourly/6 Monthly Air Compressor Maintenance

Check mark

Inspect Scavenge Tubes/Orifice and Blowdown System

Check mark

Stop the machine, electrically isolate and vent all trapped pressure.

Check mark

Disconnect the scavenge line tubing and unscrew from integrated separator/MPCV manifold.

Check mark

Inspect orifice and tubing for clogging and clean prior to re-installation.

Check mark

Is there any scaling or O-ring damage identified?

Check mark

Confirm the direction of flow is correct by observing the small arrow stamped in the center section.

Check mark

Remove inlet filter to expose inlet snout for blowdown diverter orifice examination.

Check mark

Disconnect Synflex tubing from the elbow fitting at bottom of inlet valve.

Check mark

Inspect/clean spool and all orifice features of blowdown fitting.

Run this procedureArrow right

Filter Element Replacement

Check mark

Preparation

Check mark

Close all air inlets

Check mark

Depressurize the filter housing

Check mark

Disassembly

Check mark

Turn the bowl counter-clockwise

Check mark

Unscrew the bowl completely from the filter head and pull it off

Check mark

Remove the exhausted element by unscrewing from the filter head

Check mark

Cleaning

Check mark

Clean the O-ring seat of the head

Run this procedureArrow right

Air Cooled Cooler Removal

Check mark

Preparation for Removal

Check mark

Stop the compressor

Check mark

Isolate the compressor from the system

Check mark

Press the emergency stop to vent the separator tank and airend

Check mark

Ensure the main power disconnect switch is locked off and tagged

Check mark

Removal of Air Cooled Cooler

Check mark

Use certified lifting equipment for any required lifting of air compressor parts

Check mark

Remove front and back access panels

Check mark

Disconnect aftercooler discharge tube or hose

Run this procedureArrow right

2000 Hourly/3 Monthly Air Compressor Maintenance

Check mark

Inspect Components

Check mark

Inspect Starter box power drive element (PDM) filter element (if applicable)

Check mark

Inspect Drive belt

Check mark

Inspect Airend/Pressure System/Receiver

Check mark

Check High Airend Temperature Sensor

Check mark

Inspect and Test Pressure Relief Valve

Check mark

Inspect and test pressure relief valve on airend and receiver tank

Check mark

Replace Air Filter Element

Check mark

Check the retaining cap for dirt and debris and wipe clean

Run this procedureArrow right

Motor Cowl Cleaning

Check mark

Pre-maintenance Safety Check

Check mark

Ensure the compressor is electrically isolated for at least 15 minutes before commencing any maintenance work

Check mark

Panel Removal

Check mark

Remove the panels from the compressor

Check mark

Motor Cowl Cleaning

Check mark

Use a clean dry cloth to remove dust from the surface of the motor cowl

Check mark

Panel Replacement

Check mark

Replace the panels

Check mark

Post-cleaning Verification

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ingersoll Rand

Explore Other Assets