MaintainX Asset Hub logo
EnterprisePricing
Ingersoll Rand

Ingersoll Rand Rotary Screw Air Compressor R11n 65-145

Need answers fast?
Explore the manual using AI.

Ingersoll Rand Rotary Screw Air Compressor R11n 65-145
Ingersoll Rand Rotary Screw Air Compressor R11n 65-145

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Ingersoll Rand Rotary Screw Air Compressor R11n 65-145

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ingersoll Rand Rotary Screw Air Compressor R11n 65-145

Ingersoll Rand Rotary Screw Air Compressor R11n 65-145

Create an account to install this asset package.

Maintenance Plans for Ingersoll Rand Rotary Screw Air Compressor Model R11n 65-145

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Air Compressor Maintenance

Check mark

Inspect components for blockage or issues

Check mark

Clean Dryer condenser with compressed air (if applicable)

Check mark

Check Drive belt tension

Run this procedureArrow right

1 Monthly Dryer Maintenance

Check mark

Condenser Cleaning

Check mark

Clean condenser with compressed air, do not damage fins

Check mark

Filter Inspection

Check mark

Check condition of filters

Check mark

Replace filters if necessary

Check mark

Operational Check

Check mark

Is the dryer working properly after maintenance?

Run this procedureArrow right

4000 Hourly/6 Monthly Air Compressor Maintenance

Check mark

Inspect Scavenge Tubes/Orifice and Blowdown System

Check mark

Inspect scavenge orifice and tubing for blockage and clean if necessary

Check mark

Inspect blowdown diverter orifice and clean if necessary

Check mark

Inspect blowdown valve and controls tubing for blockage and clean if necessary

Check mark

Is the direction of flow correct after re-installation?

Check mark

Replace Starter Box Power Drive Element (PDM) Filter Element

Check mark

Ensure compressor is electrically isolated for at least 15 minutes

Check mark

Replace the filter element in the starter box filter housing

Check mark

Clean Air-Cooled Combination Cooling System

Run this procedureArrow right

Coolant Hoses Replacement

Check mark

Coolant Draining

Check mark

Is the hose location containing compressor coolant?

Check mark

Drain the coolant into a clean container

Check mark

Cover the container to prevent contamination

Check mark

Is the coolant contaminated?

Check mark

Replace with new coolant if contaminated

Check mark

Remove the old hose

Check mark

Install the new hose

Check mark

Coolant Refill and Leak Check

Run this procedureArrow right

Motor Cowl Cleaning

Check mark

Pre-maintenance Safety Check

Check mark

Ensure the compressor is electrically isolated for at least 15 minutes before commencing any maintenance work.

Check mark

Panel Removal

Check mark

Remove the panels from the compressor.

Check mark

Motor Cowl Cleaning

Check mark

Use a clean dry cloth to remove dust from the surface of the motor cowl.

Check mark

Ensure all ventilation slots are free of obstructions.

Check mark

Panel Replacement

Check mark

Replace the panels.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ingersoll Rand

Explore Other Assets