MaintainX Asset Hub logo
EnterprisePricing
Ingersoll Rand

Ingersoll Rand Rotary Screw Air Compressor R5.5n 65-145

Need answers fast?
Explore the manual using AI.

Ingersoll Rand Rotary Screw Air Compressor R5.5n 65-145
Ingersoll Rand Rotary Screw Air Compressor R5.5n 65-145

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Ingersoll Rand Rotary Screw Air Compressor R5.5n 65-145

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ingersoll Rand Rotary Screw Air Compressor R5.5n 65-145

Ingersoll Rand Rotary Screw Air Compressor R5.5n 65-145

Create an account to install this asset package.

Maintenance Plans for Ingersoll Rand Rotary Screw Air Compressor Model R5.5n 65-145

Integrate maintenance plans directly into your work orders in MaintainX.

Coolant Hoses Replacement

Check mark

Coolant Draining

Check mark

Is the coolant contaminated?

Check mark

Drain the coolant into a clean container and cover it

Check mark

Remove the old hose

Check mark

Install the new hose

Check mark

Coolant Refill and Leak Check

Check mark

Refill the compressor with coolant

Check mark

Start the compressor

Check mark

Check for leaks

Run this procedureArrow right

2000 Hourly/3 Monthly Air Compressor Maintenance

Check mark

Inspection Tasks

Check mark

Inspect Starter box power drive element (PDM) filter element (if applicable)

Check mark

Inspect Drive belt

Check mark

Inspect and test pressure relief valve

Check mark

Inspect Airend/Pressure System/Receiver

Check mark

Check High Airend Temperature Sensor

Check mark

Inspect external surfaces of the airend for damage, corrosion, and abrasions

Check mark

Replacement Tasks

Check mark

Replace Air filter element

Run this procedureArrow right

Filter Element Replacement

Check mark

Preparation

Check mark

Close all air inlets and depressurize the filter housing

Check mark

Disassembly

Check mark

Turn the bowl in counter-clockwise direction

Check mark

Unscrew the bowl completely from the filter head and pull it off

Check mark

Remove the exhausted element by unscrewing from the filter head

Check mark

Cleaning

Check mark

Clean the O-ring seat of the head where you insert the element

Check mark

Clean the threads of the head

Run this procedureArrow right

1 Weekly Air Compressor Check

Check mark

Preparation

Check mark

Ensure the compressor is electrically isolated for at least 15 minutes before commencing any maintenance work.

Check mark

Isolate the compressor from the system and fully discharge the compressed air within the compressor.

Check mark

Cleaning / Checking Condensate Drain

Check mark

Remove tubes from drain assembly.

Check mark

Remove screen from drain assembly.

Check mark

Carefully clean screen of debris.

Check mark

Reinstall screen and reattach tubes to drain assembly.

Check mark

Final Checks

Run this procedureArrow right

8000 Hourly/1 Yearly Air Compressor Maintenance

Check mark

Coolant Replacement

Check mark

Replace Premium Coolant (Ultra)

Check mark

Valve Replacement

Check mark

Replace Minimum pressure check valve (MPCV)

Check mark

Condensate Drain Lines Inspection

Check mark

Check Condensate drain lines for any issues

Check mark

Were any condensate drain lines replaced?

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ingersoll Rand

Explore Other Assets