MaintainX, an Autodesk company
EnterprisePricing
Ingersoll Rand

Ingersoll Rand Compressor N37K Single Stage

Need answers fast?
Explore the manual using AI.

Ingersoll Rand Compressor N37K Single Stage
Ingersoll Rand Compressor N37K Single Stage

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Ingersoll Rand Compressor N37K Single Stage

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ingersoll Rand Compressor N37K Single Stage

Ingersoll Rand Compressor N37K Single Stage

Create an account to install this asset package.

Maintenance Plans for Ingersoll Rand Compressor Model N37K Single Stage

Integrate maintenance plans directly into your work orders in MaintainX.

1000 Hourly / 6 Monthly Food Grade Coolant Replacement

Check mark

Food Grade Coolant - Change

Check mark

Safety Precautions

Check mark

Ensure the coolant filter and coolant are not hot before proceeding

Check mark

Coolant Draining Process

Check mark

Remove the cap from the drain valve located at the front of the separator vessel

Check mark

Place a suitable container close to the drain valve

Check mark

Screw the coolant drain hose onto the drain valve

Check mark

Ensure the valve automatically opens and the coolant drains

Check mark

Remove the drain hose and ensure the valve automatically closes and seals

Run this procedureArrow right

Moisture Separator Maintenance

Check mark

Ensure compressor is electrically isolated for at least 15 minutes before commencing any maintenance work

Check mark

Isolate the compressor from the system

Check mark

Fully discharge the compressed air within the unit

Check mark

Remove plastic tube from the fitting located on the bottom of the moisture separator

Check mark

Remove the bowl of the moisture trap

Check mark

Clean the bowl of the moisture trap

Check mark

Replace the bowl of the moisture trap

Run this procedureArrow right

1 Yearly Compressor Maintenance

Check mark

Air Filter Maintenance

Check mark

Check and replace air filter if needed

Check mark

Scavenge screen - Check / clean

Run this procedureArrow right

8000 Hourly Compressor Replacement

Check mark

Coolant Filter Replacement

Check mark

Loosen filter element with the correct tool.

Check mark

Remove the element from the housing.

Check mark

Place the old element in a sealed bag and dispose of in a safe way.

Check mark

Clean the mating face of the housing.

Check mark

Remove the new Ingersoll Rand replacement element from its protective package.

Check mark

Apply a small amount of coolant to the element seal.

Check mark

Screw the new element down until the seal makes contact with the housing, then hand tighten a further half turn.

Check mark

Post Replacement Check

Run this procedureArrow right

4000 Hourly Compressor Replacement

Check mark

Coolant filter - Change

Check mark

Loosen filter element with the correct tool.

Check mark

Remove the element from the housing.

Check mark

Place the old element in a sealed bag and dispose of in a safe way.

Check mark

Clean the mating face of the housing.

Check mark

Remove the new Ingersoll Rand replacement element from its protective package.

Check mark

Apply a small amount of coolant to the element seal.

Check mark

Screw the new element down until the seal makes contact with the housing, then hand tighten a further half turn.

Check mark

Start the compressor and check for leaks and check the coolant level.

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ingersoll Rand

Explore Other Assets