MaintainX, an Autodesk company
EnterprisePricing
Ingersoll Rand

Ingersoll Rand Compressor N200H Single Stage

Need answers fast?
Explore the manual using AI.

Ingersoll Rand Compressor N200H Single Stage
Ingersoll Rand Compressor N200H Single Stage

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Ingersoll Rand Compressor N200H Single Stage

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ingersoll Rand Compressor N200H Single Stage

Ingersoll Rand Compressor N200H Single Stage

Create an account to install this asset package.

Maintenance Plans for Ingersoll Rand Compressor Model N200H Single Stage

Integrate maintenance plans directly into your work orders in MaintainX.

Blower/Fan Motor Bearing Maintenance

Check mark

Pre-storage Maintenance

Check mark

Rotate the blower motor several revolutions by hand in the direction of rotation

Check mark

Pump grease into the bearing while rotating the motor

Check mark

Is grease visible at the relief port?

Check mark

Ongoing Maintenance

Check mark

Rotate the motor every three months until the unit is placed in service

Check mark

Long-term Storage Consideration

Check mark

Is the storage time expected to exceed nine months?

Check mark

Order the compressor for long-term storage if storage exceeds nine months

Run this procedureArrow right

4000 Hourly Compressor Replacement

Check mark

Coolant Filter Replacement

Check mark

Loosen filter element with the correct tool

Check mark

Remove the element from the housing

Check mark

Place the old element in a sealed bag and dispose of in a safe way

Check mark

Clean the mating face of the housing

Check mark

Remove the new Ingersoll Rand replacement element from its protective package

Check mark

Apply a small amount of coolant to the element seal

Check mark

Screw the new element down until the seal makes contact with the housing, then hand tighten a further half turn

Check mark

Post Replacement Check

Run this procedureArrow right

1000 Hourly / 6 Monthly Food Grade Coolant Replacement

Check mark

Food Grade Coolant - Change

Check mark

Ensure the coolant filter and coolant are not too hot before proceeding

Check mark

Coolant Draining Process

Check mark

Remove the cap from the drain valve located at the front of the separator vessel

Check mark

Place a suitable container close to the drain valve

Check mark

Screw the coolant drain hose onto the drain valve

Check mark

Ensure the valve automatically opens and the coolant drains

Check mark

Remove the drain hose and ensure the valve automatically closes and seals

Check mark

Replace the cap on the drain valve

Run this procedureArrow right

1 Daily Coolant Check

Check mark

Coolant Level Check

Check mark

Check coolant level in sight glass while machine is running on load

Check mark

Is coolant visible in the sight glass while machine is running?

Check mark

Coolant Level Verification After Stopping Machine

Check mark

Stop the machine

Check mark

Is coolant still visible in the sight glass after stopping the machine?

Check mark

Adding Coolant

Check mark

Run the compressor for a minimum of 40 seconds

Check mark

Is coolant visible in the sight glass after running the compressor?

Run this procedureArrow right

Separator Tank Scavenge Check Valve/Orifice Check

Check mark

Disassembly

Check mark

Disconnect tubing at each end of check valve/screen/orifice assembly

Check mark

Orifice Inspection and Cleaning

Check mark

Check orifice for cleanliness and condition

Check mark

Clean orifice if required

Check mark

Use suitable tool to remove orifice from its housing

Check mark

Ensure no damage to flared end of fitting or O-ring

Check mark

Housing Cleaning

Check mark

Wash housing in safety solvent

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ingersoll Rand

Explore Other Assets