MaintainX Asset Hub logo
EnterprisePricing
HOVAL

HOVAL Circulation Unit THC-6BD/ST.DN/S.--.LU

Need answers fast?
Explore the manual using AI.

HOVAL Circulation Unit THC-6BD/ST.DN/S.--.LU
HOVAL Circulation Unit THC-6BD/ST.DN/S.--.LU

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for HOVAL Circulation Unit THC-6BD/ST.DN/S.--.LU

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

HOVAL Circulation Unit THC-6BD/ST.DN/S.--.LU

HOVAL Circulation Unit THC-6BD/ST.DN/S.--.LU

Create an account to install this asset package.

Maintenance Plans for HOVAL Circulation Unit Model THC-6BD/ST.DN/S.--.LU

Integrate maintenance plans directly into your work orders in MaintainX.

Circulation Unit Disassembly

Check mark

Safety Precautions

Check mark

Wear protective equipment

Check mark

Ensure no one stands under suspended loads

Check mark

Use cranes or helicopters with sufficient load-bearing capacity

Check mark

Power Disconnection

Check mark

Disconnect the power supply to the unit

Check mark

Wait at least 3 minutes after switching the unit off

Check mark

Unit Opening Precaution

Check mark

Ensure 3 minutes have passed before opening the unit

Run this procedureArrow right

1 Yearly Filter Replacement

Check mark

Safety Precautions

Check mark

Turn the isolation switch on the unit to the 'Off' position and secure it against being switched back on.

Check mark

Wait at least 3 minutes after switching off before opening the unit.

Check mark

Observe accident prevention regulations and electrical system safety precautions.

Check mark

Take precautions against unprotected, sharp metal edges when working in the unit.

Check mark

Replace damaged or removed informational and warning signs immediately.

Check mark

Reassemble all dismantled protective devices professionally after maintenance work.

Check mark

Filter Replacement

Check mark

Change the air filter in the filter box

Run this procedureArrow right

1 Yearly Recirculation Unit Maintenance

Check mark

Safety Precautions

Check mark

Turn the isolation switch on the unit to the 'Off' position and secure it against being switched back on.

Check mark

Wait at least 3 minutes after switching off before opening the unit.

Check mark

Observe safety measures

Check mark

Maintenance Work

Check mark

Check the function of the unit comprehensively.

Check mark

Clean the unit thoroughly.

Check mark

Repair the unit if necessary.

Check mark

Post-Maintenance

Run this procedureArrow right

30000 Hourly Fan Motor Replacement

Check mark

Safety Precautions

Check mark

Turn the isolation switch on the unit to the 'Off' position and secure it against being switched back on.

Check mark

Wait at least 3 minutes after switching off before opening the unit.

Check mark

Observe accident prevention regulations.

Check mark

Take precautions against unprotected, sharp metal edges when working in the unit.

Check mark

Replace damaged or removed informational and warning signs immediately.

Check mark

Replacement Procedure

Check mark

Ensure replacement parts comply with the technical requirements of the unit manufacturer.

Check mark

Use original spare parts as recommended by Hoval.

Run this procedureArrow right

Parts for HOVAL Circulation Unit THC-6BD/ST.DN/S.--.LU

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

TopVent® 6 FK Filter Box

6049725

TopVent® 6 FF Flat Filter Box

6049726

TopVent® 9 FK Filter Box

6049727

TopVent® 9 FF Flat Filter Box

6049728

TopVent® 6 FK Filter Box

6049725

TopVent® 6 FF Flat Filter Box

6049726

TopVent® 9 FK Filter Box

6049727

TopVent® 9 FF Flat Filter Box

6049728

TopVent® 6 FK Filter Box

6049725

TopVent® 6 FF Flat Filter Box

6049726

TopVent® 9 FK Filter Box

6049727

TopVent® 9 FF Flat Filter Box

6049728

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from HOVAL

Explore Other Assets