Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Honeywell Electronic Air Cleaner F300A 20x20
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Media Postfilters Replacement
Warning: Ensure the equipment is turned off before starting the replacement process
Old filter removed successfully?
Upload a photo of the removed filter
New filter installed successfully?
Upload a photo of the installed filter
Sign off on the filter replacement
Air Cleaner Operation Check
Is the air cleaner switch turned on and system blower energized?
The neon light next to the On-Off switch is on
The neon light goes off after the system blower is turned off
A snapping sound is heard when the test button is pushed with the air cleaner energized
The above steps are repeated for each fan speed with the same results
Sign off on the air cleaner operation check
1 Yearly Air Cleaner Cleaning
Warning: This cleaning procedure requires trained personnel with PPE!
Pressure drop across the air cleaner
Pressure drop is less than or equal to 0.5 in. w.c. (0.1 kPa)?
If pressure drop is more than 0.5 in. w.c. (0.1 kPa), stop the procedure and report to the maintenance team
Is the air cleaner installed downstream from an atomizing humidifier?
Does the installation include both heating and cooling?
If either of the above is true, more frequent replacement may be necessary.
Prefilters are not clogged?
If prefilters are clogged, clean them promptly to avoid restricting airflow and reducing efficiency of the heatingcooling system.
Reduce Ozon Odor Modification
CAUTION
Electric Shock Hazard.
Can cause personal injury.
Always disconnect power and open access door before opening power supply cover.
The electronic air cleaner generates a small amount of ozone in normal operation.
During the first week or two of operation, the amount may be higher because of sharp edges on some of the new high voltage metal parts.
Normal use quickly dulls these edges.
If desired, the ozone generated by the air cleaner can be reduced in one of two ways:
1. Install an activated carbon filter downstream from the air cleaner. Make sure particles from the air filter cannot fall into the air cleaner.
Ionizer Wires Replacement
Replacing Ionizer Wires
Broken or bent ionizer wires can cause an electrical short to ground, often resulting in visible arcing or sparking.
Do not use cells until broken wires are removed.
Cells can be used temporarily with one wire missing, but replace the wire as soon as possible.
Replacement wires are supplied cut to length with eyelets on both ends for easy installation.; To install:
1. Hook the eyelet on one end of the wire over the spring connector on one end of the cell.
Be careful to avoid damaging spring connectors or other parts of the cells.
2. Hold the opposite eyelet with a needle nose pliers and stretch the wire the length of the cell.
Depress the opposite spring connector and hook the eyelet over it.
Access the parts list for your equipment in MaintainX.
F300 Door Includes No. 2
32007528-003
Test Button Assembly
137980A
Electronic Cell
FC37A1049
Cell Handle
137266
Prefilter (Without Spring Clips)
203373
F300 Door Includes No. 2
32007528-003
Test Button Assembly
137980A
Electronic Cell
FC37A1049
Cell Handle
137266
Prefilter (Without Spring Clips)
203373
F300 Door Includes No. 2
32007528-003
Test Button Assembly
137980A
Electronic Cell
FC37A1049
Cell Handle
137266
Prefilter (Without Spring Clips)
203373
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX