MaintainX Asset Hub logo
EnterprisePricing
Gardner Denver

Gardner Denver Rotary Gas Compressor SSQ

Need answers fast?
Explore the manual using AI.

Gardner Denver Rotary Gas Compressor SSQ
Gardner Denver Rotary Gas Compressor SSQ

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Gardner Denver Rotary Gas Compressor SSQ

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Gardner Denver Rotary Gas Compressor SSQ

Gardner Denver Rotary Gas Compressor SSQ

Create an account to install this asset package.

Maintenance Plans for Gardner Denver Rotary Gas Compressor Model SSQ

Integrate maintenance plans directly into your work orders in MaintainX.

Compressor Oil System Check

Check mark

Pre-Check Requirements

Check mark

Ensure compressor is at operating temperature

Check mark

Temperature Checks

Check mark

Record gas and oil discharge temperature

Check mark

Is the discharge temperature within normal range for ambient temperature?

Check mark

Pressure Checks

Check mark

Record oil inlet pressure

Check mark

Record oil cooler oil pressure differential

Check mark

Post-Check Actions

Run this procedureArrow right

Oil Separator Element Maintenance

Check mark

Preparation

Check mark

Ensure the unit is completely off and that no pressure is in the oil reservoir.

Check mark

Disconnect, tag, and lockout power supply to the starter.

Check mark

Pressure Differential Gauging

Check mark

Measure the pressure differential across the oil separator.

Check mark

Is the pressure differential approximately 8 PSI or higher?

Check mark

Separator Element Inspection

Check mark

Remove the separator element.

Check mark

Shine a light inside the element to check for heavy dirt or varnish deposits.

Run this procedureArrow right

6000 Hourly Compressor Lubricant Change

Check mark

Preparation and Safety

Check mark

Observe all shutdown and lockout procedures

Check mark

Ensure all materials used are compatible with AEON Lubricating Coolants

Check mark

Draining the System

Check mark

Drain oil from compressor and cooler while hot

Check mark

Break low points connections and drain oil from pipe runs

Check mark

Dump oil from filter and reinstall used filter

Check mark

Filling with New Lubricant

Check mark

Fill the system with a 50 percent charge of the new lubricant

Run this procedureArrow right

Compressor Pre-Startup Check

Check mark

Compressor Oil Check

Check mark

Check oil level in the reservoir

Check mark

Is the oil level within the operating range during full load and normal pressure?

Check mark

Add oil if necessary to reach the top of the operating range

Check mark

Ensure the oil filter is replaced every 1000 hours

Check mark

Stop the unit and release pressure before removing the oil filler plug

Check mark

Intake Scrubber Inspection

Check mark

Inspect the scrubber to ensure it is clean

Check mark

Ensure the inlet line is tight and clean

Run this procedureArrow right

Main Oil Filter Replacement

Check mark

Safety Precautions

Check mark

Shut down compressor and relieve system of all pressure

Check mark

Disconnect, tag, and lockout power supply to the starter

Check mark

Ensure no gas pressure is in the oil reservoir

Check mark

Filter Replacement

Check mark

Refer to OEM Packager’s instructions for specific unit details

Check mark

Ensure the following parts are not disturbed

Check mark

Use only the replacement element shown on the filter tag or refer to the parts list for the part number

Check mark

Post Replacement Check

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Gardner Denver

Explore Other Assets