MaintainX Asset Hub logo
EnterprisePricing
Fulton Companies

Fulton Companies Gas Fired Steam Boiler VMP-100

Need answers fast?
Explore the manual using AI.

Fulton Companies Gas Fired Steam Boiler VMP-100
Fulton Companies Gas Fired Steam Boiler VMP-100

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Fulton Companies Gas Fired Steam Boiler VMP-100

Fulton Companies Gas Fired Steam Boiler VMP-100

Create an account to install this asset package.

Maintenance Plans for Fulton Companies Gas Fired Steam Boiler Model VMP-100

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Boiler Maintenance

Check mark

Start the boiler and generate not more than 10 PSI of steam

Check mark

Turn on tap water to blow-down separator

Check mark

Open the boiler blow-down valves for approximately 10 seconds, then close the valve

Check mark

Shut off tap water to blow-down separator

Check mark

Blow down water column each morning when boiler is at 10 PSI by opening the water column and the water gauge blow-down valves for approximately 5 seconds, then close the valves

Check mark

If the feed water is being treated by compounds, make sure that this treatment is carried out carefully and according to the manufacturer's instructions

Check mark

When first starting the boiler each day, make sure ignition and burner are working properly

Check mark

Check water level in sight glass

Check mark

Check to be sure feed water pump is working

Run this procedureArrow right

1 Monthly Boiler Maintenance

Check mark

WARNING! Make sure main power switch is off before starting work

Check mark

1. Cleaning the water gauge glass

Check mark

CAUTION! Do not clean the gauge or gauge glass while pressurized or in operation

Check mark

a. Clean the water gauge glass using a commercial non-abrasive glass cleaner. Use diluted acids such as hydrochloric (muriatic) acid when regular cleaners do not seem to work. Do not use wire brushes or any other abrasive materials which could scratch the glass. If any leakage is evident, replace the gaskets

Check mark

b. Always replace the high impact plastic gauge glass protector which is standard on all Fulton Boilers

Check mark

2. Clean water pump strainers

Check mark

3. Check scanner or flame rod and ignition electrodes

Check mark

4. Check starter contacts. Burned or pitted contacts should be replaced. Do not use sand paper or file to clean

Check mark

5. Clean water traps and strainers in fuel lines

Run this procedureArrow right

1 Weekly Boiler Check

Check mark

Boiler is cool with little or no pressure showing on the steam pressure gauge

Check mark

Burner is operating

Check mark

Boiler blow-down valves are open

Check mark

Water level in the water gauge glass

Check mark

Burner shut off when water level fell below the low water electrode in the water column assembly and/or the boiler shell

Check mark

Manual reset of the low water relay is required

Check mark

Sign off on the weekly boiler check

Run this procedureArrow right

1 Yearly Boiler Maintenance

Check mark

1. Have combustion (CO2, O2, CO) and input checked by responsible personnel

Check mark

2. Dirty flues can cause air flow restrictions resulting in poor combustion and loss of efficiency. Clean flues as follows

Check mark

a. Remove the outer flue cover plate

Check mark

b. Remove inner plate and turbultors

Check mark

c. Remove clean out plugs at lowest part of unit and clean the bottom of combustion chamber

Check mark

d. Remove all soot from the top, and from the clean out plugs at the bottom with a vacuum cleaner

Check mark

e. Replace clean out plugs carefully so as not to damage insulation and replace burner and flue cover plates

Check mark

3. Flush boiler out if necessary. See Section 2 for proper procedure for "Cleaning the Pressure Vessel."

Check mark

4. Provide annual inspection by a qualified ASME Boiler inspector;

Run this procedureArrow right

6 Monthly Boiler Maintenance

Check mark

1. Cleaning the gas burner assembly

Check mark

a. Disconnect the gas head from the burner by disconnecting the union. Remove the burner plate screws. Withdraw the burner assembly and clean the flame rod and ignition electrode

Check mark

b. Check that the settings of the flame rod, if applicable, and ignition electrode correspond to those in the illustration below

Check mark

c. Reassemble the burner assembly and check the flame rod setting or scanner setting

Check mark

d. Check the combustion efficiency of the burner and adjust if necessary

Check mark

e. Clean probe on top of boiler shell and probes in water column. There must be no pressure on the boiler during the removal of the probes

Check mark

f. Check refractories for soot or breakage and inspect the stainless steel ring (50-100 HP only)

Check mark

g. With the boiler under no more than 15 PSI pressure, check that the steam safety valve is operating by lifting the lever

Check mark

2. Drain condensate tank and clean tank by flushing with hose. Check float valve operation

Run this procedureArrow right

Parts for Fulton Companies Gas Fired Steam Boiler VMP-100

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

10" Water Gauge Glass - MM

2-12-2018

1-1/2" Gas Pressure Regulator - RV 81

2-30-107

1-1/2" Main Gas Cock

2-30-115

1-1/2" Main Gas Valve - V48A

2-30-303

1-1/4" Vent Valve - 120V Normally Open

2-30-402

10" Water Gauge Glass - MM

2-12-2018

1-1/2" Gas Pressure Regulator - RV 81

2-30-107

1-1/2" Main Gas Cock

2-30-115

1-1/2" Main Gas Valve - V48A

2-30-303

1-1/4" Vent Valve - 120V Normally Open

2-30-402

10" Water Gauge Glass - MM

2-12-2018

1-1/2" Gas Pressure Regulator - RV 81

2-30-107

1-1/2" Main Gas Cock

2-30-115

1-1/2" Main Gas Valve - V48A

2-30-303

1-1/4" Vent Valve - 120V Normally Open

2-30-402

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Fulton Companies

Explore Other Assets