MaintainX Logo
EnterprisePricing
Daikin

Daikin Air Cooled Chiller EWAD-TZ-D

Need answers fast?
Explore the manual using AI.

Daikin Air Cooled Chiller EWAD-TZ-D
Daikin Air Cooled Chiller EWAD-TZ-D

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Air Cooled Chiller EWAD-TZ-D

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Air Cooled Chiller EWAD-TZ-D

Daikin Air Cooled Chiller EWAD-TZ-D

Create an account to install this asset package.

Maintenance Plans for Daikin Air Cooled Chiller Model EWAD-TZ-D

Integrate maintenance plans directly into your work orders in MaintainX.

Initial Screw Chiller Check

Check mark

General

Check mark

Check for external damage

Check mark

Open all isolation and / or shut-off valves

Check mark

Verify that the unit is pressurized with refrigerant in all of its parts before making the connection to the hydraulic circuit.

Check mark

Check the oil level in the compressors

Check mark

Control wells, thermometers, manometers, controls, etc. installed

Check mark

Availability of at least 25% of the machine load for testing and control settings

Check mark

Refrigerated water

Check mark

Piping completion

Run this procedureArrow right

1 Yearly Water Rinse Condenser Coils / Hydronic Freecooling Coils Cleaning

Check mark

IMPORTANT: This procedure should be performed by trained personnel only.

Check mark

CAUTION: In environments with a high concentration of air-borne particles, it might be necessary to clean the condenser coils more often.

Check mark

Check for particles and fibers that could clog up the exchangers

Check mark

IMPORTANT: Pay special attention if water rich in calcium carbonate is used.

Check mark

Measure the pressure drops

Check mark

Measure the thermal efficiency

Check mark

IMPORTANT: An increase in pressure drops or a decrease in thermal efficiency means that the heat exchangers are clogged.

Check mark

Check if the heat exchangers are clogged

Check mark

CAUTION: In environments with a high concentration of air-borne particles, it might be necessary to clean the condenser bank more often.

Run this procedureArrow right

Screw Chiller Inspection

Check mark

Is the machine intact and free from deformations?

Check mark

Check all components described in the delivery note

Check mark

If any damage is found, do not remove the damaged material and immediately make a written complaint to the transport company.

Check mark

Upload a set of photographs of the damage

Check mark

Daikin Applied Europe S.p.A. declines all responsibility for any damage that the machine may suffer during transport to the destination.

Check mark

Is the model and power supply voltage shown on the nameplate correct?

Check mark

Responsibility for any damage after acceptance of the unit cannot be attributed to the manufacturer.

Check mark

Sign off on the inspection

Run this procedureArrow right

1 Yearly Screw Chiller Maintenance

Check mark

Verification of thermal insulation integrity

Check mark

Clean and paint where necessary

Check mark

Water analysis: Check for any dissolved metals

Check mark

Verification of control sequence

Check mark

Verify contactor wear – Replace if necessary

Check mark

Verify that all electrical terminals are tight – Tighten if necessary

Check mark

Clean inside the electrical control board

Check mark

Measure compressor motor insulation using the Megger

Check mark

Verify operation of all ventilation fans in the electrical panel

Run this procedureArrow right

3 Monthly E-Coated Coil Maintenance

Check mark

Warning: Failure to clean an E-coated coil will void the warranty and may result in reduced efficiency and durability in the environment.

Check mark

Is the coil visibly dirty?

Check mark

If the coil is visibly dirty, proceed with the following steps. If not, skip to step 7.

Check mark

Cleaning the coil

Check mark

Steps for cleaning the coil

Check mark

Is the coil clean after the first attempt?

Check mark

If the coil is not clean after the first attempt, repeat steps 4-6.

Check mark

Removing soluble salts

Check mark

Steps for removing soluble salts

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets