Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Air Cooled Chiller EWFH-TZ-D
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Water Rinse Condenser Coils / Hydronic Freecooling Coils Cleaning
IMPORTANT: This procedure should be performed by trained personnel only.
CAUTION: In environments with a high concentration of air-borne particles, it might be necessary to clean the condenser coils more often.
Are the condenser banks clean?
If not, clean condenser banks with clean water.
Are the water heat exchangers clean?
If not, clean water heat exchangers with appropriate chemicals.
CAUTION: Particles and fibers could clog up the exchangers, especially for water exchangers pay attention if water rich in calcium carbonate is used.
Is there an increase in pressure drops or a decrease in thermal efficiency?
If yes, this means that the heat exchangers are clogged and need to be cleaned.
Initial Screw Chiller Check
General
Check for external damage
Open all isolation and / or shut-off valves
Verify that the unit is pressurized with refrigerant in all of its parts before making the connection to the hydraulic circuit.
Check the oil level in the compressors
Control wells, thermometers, manometers, controls, etc. installed
Availability of at least 25% of the machine load for testing and control settings
Refrigerated water
Piping completion
1 Yearly Screw Chiller Maintenance
Verification of thermal insulation integrity
Clean and paint where necessary
Water analysis: Check for any dissolved metals
Verification of control sequence
Verify contactor wear – Replace if necessary
Verify that all electrical terminals are tight – Tighten if necessary
Clean inside the electrical control board
Measure compressor motor insulation using the Megger
Verify operation of all ventilation fans in the electrical panel
1 Yearly Compressor Oil Check
Enter the TAN (Total Acid Number)
Action based on TAN
Enter the date of next check
Sign off on the compressor oil check
Screw Chiller Check
Warning: This check requires an authorized agency for chillers in category II → III as per European Directive 2014/68/EU (PED).
Is the chiller in category II → III?
If the chiller is not in category II → III, stop the procedure and report to the supervisor.
Chiller passed the inspection?
Issues found during the inspection
Authorized agency representative's signature
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX