

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Cornell Pump Company Pump 6NHTA
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Balance Line Inspection
3200-326 Startup Checklist — Instructions for Pumps with Balance Line and Wear Rings
Check wear rings for damage
Inspect balance lines for obstructions
Replace balance lines if pinched, bent, or corroded
Ensure balance lines are free of obstructions
1 Daily Mechanical Seal Leakage Inspection
3200-632 Maintenance — Instructions for Mechanical Seal
Examine the pump for leakage from the mechanical seal
Is there any leakage from the mechanical seal?
Has the leakage reduced to almost zero since the last inspection?
Inspect the assembly for proper seal installation if leakage persists
Ensure the pump is not run dry unless equipped with Run-Dry option
Wear Ring Inspection
3200-326 Startup Checklist — Instructions for Pumps with Balance Line and Wear Rings
Check wear ring clearance
Is the wear ring clearance within acceptable limits?
Inspect balance lines for obstructions
Check balance lines for pinching, bending, or corrosion
Replace wear rings if clearance exceeds .03" per side
Replace balance lines if pinched, bent, or corroded
1 Yearly Cutter Clearance Calibration
3200-992 Cutter Modification Kit — Adjusting
Ensure all safety precautions are followed
Disconnect external connections to gain access to suction inlet of pump
Isolate and lockout all power to the pump and motor
Remove the coupling guard for manual rotation of the pump
Loosen cap screws holding stationary cutter plate to volute casing or suction cover
Bottom out the stationary cutter plate to the rotating cutter ring
Remove debris if necessary
Set stationary cutter plate to rotating cutter ring clearance between .010"-.020" using adjustable set screws
3 Monthly Frame Oil Change — F5K
3200-902 Lubrication Instructions — Oil Lubricated Frame Pumps (F5K)
Verify frame size and oil capacity
Enter the oil renewal interval (months)
Ensure the pump is not operating before checking and filling oil
Measure the oil level and fill to the indicated level on the housing
Is the oil level maintained?
Select the oil type used based on temperature
Measure the bearing frame temperature at the drain connection
Ensure no dirt or moisture enters during the oil change process
Access the parts list for your equipment in MaintainX.
Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor
N10263-415
Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor
N10263-415
Cornell 60/40 Propylene Glycol Run-Dry Fluid With Corrosion Inhibitor
N10263-415
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













