

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Busch Compressor NC 0400 B LZ1
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Compressor Maintenance
Check the oil level
Shut down the machine
Wait 1 minute before checking the oil level after shutdown
Ensure oil level is between the middle of the oil sight glass and 3mm above it
Fill up oil if necessary
Check the cooling liquid level
Shut down the machine
Fill up cooling liquid if necessary
Check the machine for oil leaks
1 Yearly Compressor Maintenance
Visual Inspection and Cleaning
Carry out a visual inspection of the machine
Clean the machine from dust and dirt
Electrical Connections and Monitoring Devices
Check the electrical connections
Check the monitoring devices
Optional Accessories Maintenance
Check the filter of the gas ballast valve (GB)
Change the gas ballast filter if necessary
5000 Hourly / 1 Yearly Compressor Maintenance
Oil Change
Change the oil of the gear and bearing housings (both sides)
Ensure correct oil type is used
Write down the oil change date on the sticker
Is there a sticker on the machine?
Order sticker from Busch representative if not present
Cooling Liquid Maintenance
Change the cooling liquid
Verify cooling liquid specifications
Access the parts list for your equipment in MaintainX.
Cooling Liquid Part Number 5 L Packaging
0831 563 469
Cooling Liquid Part Number 25 L Packaging
0831 563 468
Oil ISO-VG
100
Oil Part Number 1 L Packaging
0831 573 786
Oil Part Number 5 L Packaging
0831 573 788
Cooling Liquid Part Number 5 L Packaging
0831 563 469
Cooling Liquid Part Number 25 L Packaging
0831 563 468
Oil ISO-VG
100
Oil Part Number 1 L Packaging
0831 573 786
Oil Part Number 5 L Packaging
0831 573 788
Cooling Liquid Part Number 5 L Packaging
0831 563 469
Cooling Liquid Part Number 25 L Packaging
0831 563 468
Oil ISO-VG
100
Oil Part Number 1 L Packaging
0831 573 786
Oil Part Number 5 L Packaging
0831 573 788
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













