

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Hoshizaki Refrigeration Equipment KM-900MWH
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Storage Bin / Scoop Maintenance
Preparation
Wash your hands before removing ice
Use the plastic scoop provided
Storage Bin Usage
Ensure the Storage Bin is used for ice only
Cleaning Procedures
Clean the scoop using a neutral cleaner
Rinse the scoop thoroughly after cleaning
Clean the bin liner using a neutral cleaner
Refrigeration Equipment Cleaning
Safety Precautions
Ensure all components, fasteners, and thumbscrews are securely in place after maintenance or cleaning
Wear liquid-proof gloves for safe handling of cleaning and sanitizing solution
Cleaning Procedure
Dilute 16 fl. oz. of recommended cleaner with 3 gallons of water
Remove all ice from the Evaporator and the Storage Bin
Turn off the power supply
Remove the Front Panel and Insulation Panel
Remove the Base Cover
Water From Water-Cooled Condenser Removal
Remove the Front Panel
Move the Control Switch to the 'OFF' position
Wait for 3 minutes
Move the Control Switch to the 'ICE' position
Allow 5 minutes for the icemaker to fill with water and the Water Pump to start operating
Close the Water-cooled Condenser Water Supply Line Shut-off Valve
Open the Drain Valve for the water-cooled condenser water supply line
Allow the line to drain by gravity
Attach compressed air or carbon dioxide supply to the Condenser Water Line Drain Valve
Evaporator Replacement
Turn off the power supply
Remove the panels and the Top Insulation over the Evaporator
Recover the refrigerant and store it in an approved container
Remove the Spray Tubes and the Insulations at the 'U' shaped notch where the refrigeration tubings go through the molded chassis
Remove the Insulation Tube, and disconnect the Evaporator Inlet Tubing at the Tee next to the Expansion Valve
Lift up the Evaporator, and disconnect the Evaporator Outlet Tubing
Install the new Evaporator
Install the new Drier
Check for leaks using nitrogen gas (140 PSIG) and soap bubbles
Spray Tube Replacement
Turn off the power supply
Remove the Front Panel and the Insulation Panel
Remove the Rubber Hoses from the Spray Tubes (Water Supply Pipe)
Release the Clamps, and disconnect the Rubber Hoses
Remove the Spray Tubes by squeezing the side tabs
Install the new Spray Tubes, and replace the removed parts in the reverse order of which they were removed
Replace the panels in their correct positions
Turn on the power supply
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













