MaintainX, an Autodesk company
EnterprisePricing
Hoshizaki

Hoshizaki Refrigeration Equipment KM-900MWH

Need answers fast?
Explore the manual using AI.

Hoshizaki Refrigeration Equipment KM-900MWH
Hoshizaki Refrigeration Equipment KM-900MWH

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Hoshizaki Refrigeration Equipment KM-900MWH

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Hoshizaki Refrigeration Equipment KM-900MWH

Hoshizaki Refrigeration Equipment KM-900MWH

Create an account to install this asset package.

Maintenance Plans for Hoshizaki Refrigeration Equipment Model KM-900MWH

Integrate maintenance plans directly into your work orders in MaintainX.

Storage Bin / Scoop Maintenance

Check mark

Preparation

Check mark

Wash your hands before removing ice

Check mark

Use the plastic scoop provided

Check mark

Storage Bin Usage

Check mark

Ensure the Storage Bin is used for ice only

Check mark

Cleaning Procedures

Check mark

Clean the scoop using a neutral cleaner

Check mark

Rinse the scoop thoroughly after cleaning

Check mark

Clean the bin liner using a neutral cleaner

Run this procedureArrow right

Refrigeration Equipment Cleaning

Check mark

Safety Precautions

Check mark

Ensure all components, fasteners, and thumbscrews are securely in place after maintenance or cleaning

Check mark

Wear liquid-proof gloves for safe handling of cleaning and sanitizing solution

Check mark

Cleaning Procedure

Check mark

Dilute 16 fl. oz. of recommended cleaner with 3 gallons of water

Check mark

Remove all ice from the Evaporator and the Storage Bin

Check mark

Turn off the power supply

Check mark

Remove the Front Panel and Insulation Panel

Check mark

Remove the Base Cover

Run this procedureArrow right

Water From Water-Cooled Condenser Removal

Check mark

Remove the Front Panel

Check mark

Move the Control Switch to the 'OFF' position

Check mark

Wait for 3 minutes

Check mark

Move the Control Switch to the 'ICE' position

Check mark

Allow 5 minutes for the icemaker to fill with water and the Water Pump to start operating

Check mark

Close the Water-cooled Condenser Water Supply Line Shut-off Valve

Check mark

Open the Drain Valve for the water-cooled condenser water supply line

Check mark

Allow the line to drain by gravity

Check mark

Attach compressed air or carbon dioxide supply to the Condenser Water Line Drain Valve

Run this procedureArrow right

Evaporator Replacement

Check mark

Turn off the power supply

Check mark

Remove the panels and the Top Insulation over the Evaporator

Check mark

Recover the refrigerant and store it in an approved container

Check mark

Remove the Spray Tubes and the Insulations at the 'U' shaped notch where the refrigeration tubings go through the molded chassis

Check mark

Remove the Insulation Tube, and disconnect the Evaporator Inlet Tubing at the Tee next to the Expansion Valve

Check mark

Lift up the Evaporator, and disconnect the Evaporator Outlet Tubing

Check mark

Install the new Evaporator

Check mark

Install the new Drier

Check mark

Check for leaks using nitrogen gas (140 PSIG) and soap bubbles

Run this procedureArrow right

Spray Tube Replacement

Check mark

Turn off the power supply

Check mark

Remove the Front Panel and the Insulation Panel

Check mark

Remove the Rubber Hoses from the Spray Tubes (Water Supply Pipe)

Check mark

Release the Clamps, and disconnect the Rubber Hoses

Check mark

Remove the Spray Tubes by squeezing the side tabs

Check mark

Install the new Spray Tubes, and replace the removed parts in the reverse order of which they were removed

Check mark

Replace the panels in their correct positions

Check mark

Turn on the power supply

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Hoshizaki

Explore Other Assets