

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Heatcraft Condensing Unit LDV4000M6D
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Condensing Unit Visual Inspection
Preventive Maintenance Guidelines — Air-Cooled Condensing Units — Quarterly
Visually inspect unit.
Look for signs of oil stains
Pay close attention to areas
Check any suspect areas with an electronic leak detector.
Repair any leaks found and add refrigerant as needed.
Check condition of moisture indicator/sightglass in the sight glass if so equipped.
Replace liquid line drier if there is indication of slight presence of moisture.
Replace refrigerant, oil and drier if moisture concentration is indicated to be high.
Head Pressure Control Check
Head Pressure Control
Verify the types of head pressure control systems available on condensing units
Dual Valve System — Operation and Adjustment
Measure the discharge pressure of the ORI valve
Adjust the ORI valve to maintain a discharge pressure of 150 PSIG for medium temperature systems
Adjust the ORI valve to maintain a discharge pressure of 100 PSIG for low temperature systems
Ensure sufficient charge to partially flood the condenser during low ambient conditions
Were adjustments made during mild or low ambient conditions?
Describe any readjustments made during cooler conditions
1 Yearly Suction Accumulator Inspection
Preventive Maintenance Guidelines — Air-Cooled Condensing Units — Annually
Inspect suction accumulator (if equipped)
Is the accumulator insulated?
Inspect for leaks and corrosion
Pay close attention to all copper to steel brazed connections
Wire brush all corroded areas and peeling paint
Apply an anticorrosion primer and paint as required
Re-insulate if applicable
Initial Start-Up Check
Check Out and Start Up
Ensure all connections are tight
Observe compressor oil level before start-up
Remove shipping spacers and install neoprene washers on compressor feet
Check and adjust controls if necessary
Check and adjust room thermostat for normal operation
Read and file wiring diagrams and instruction bulletins
Check fan motors
Temporarily wire evaporator fan motors for continuous operation
6 Monthly Condensing Unit Maintenance
Preventive Maintenance Guidelines — Air-Cooled Condensing Units — Semi-Annually
Repeat all quarterly inspection items
Clean Condenser Coil and Blades
Select cleaning tools used
Was a non-acid based foam cleaner used?
Follow label directions for appropriate use
Rinse until no residue remains
Check Operation of Condenser Fans
Do all fans rotate freely and quietly?
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













