

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Heatcraft Condensing Unit LDV3500M6D
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Suction Accumulator Inspection
Preventive Maintenance Guidelines — Air-Cooled Condensing Units — Annually
Inspect suction accumulator
Is the accumulator insulated?
Inspect for leaks and corrosion
Pay close attention to all copper to steel brazed connections
Wire brush all corroded areas and peeling paint
Apply an anticorrosion primer and paint as required
Re-insulate if applicable
System Evacuation and Refrigerant Charging
Check System Pressure
Ensure safe discharge of dry air or nitrogen holding charge
Inspect and check system pressure before charging with refrigerant
Ensure Schrader core(s) are not removed without checking pressure
Avoid using ports on filter driers for releasing system holding charge
Evacuation and Leak Detection
Ensure all service valves are open after completing piping connections
Pressurize the system to 150 psig with dry nitrogen or dry CO2
Verify system is still pressurized to 150 psig after 12 hours
Initial Start-Up Check
Check Out and Start Up
Ensure all electrical and refrigerant connections are tight
Observe compressor oil level before start-up
Remove upper mounting nuts on the compressor feet and install neoprene washers
Check and adjust controls if necessary
Check and adjust room thermostat for normal operation
Read and file wiring diagrams and instruction bulletins
Check all fan motors for proper rotation and alignment
Temporarily wire evaporator fan motors for continuous operation
3 Monthly Condensing Unit Visual Inspection
Preventive Maintenance Guidelines — Air-Cooled Condensing Units — Quarterly
Visually inspect unit
Look for signs of oil stains
Pay close attention to areas
Check suspect areas with an electronic leak detector
Repair any leaks found and add refrigerant as needed
Check condition of moisture indicator/sightglass
Replace liquid line drier if slight presence of moisture is indicated
Replace refrigerant, oil, and drier if high moisture concentration is indicated
1 Yearly Oil Analysis
Preventive Maintenance Guidelines — Air-Cooled Condensing Units — Annually
Submit an oil sample for analysis
Check for high concentrations
Change oil and driers until test results read normal
Investigate source of high metal concentrations
Check for possible sources of issues
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













