Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Hoshizaki Refrigeration Equipment KM-900MRH3
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Refrigeration Equipment Cleaning
Safety Precautions
Ensure all components, fasteners, and thumbscrews are securely in place after maintenance or cleaning
Wear liquid-proof gloves for safe handling of cleaning and sanitizing solution
Cleaning Procedure
Dilute 16 fl. oz. of recommended cleaner with 3 gallons of water
Remove all ice from the Evaporator and the Storage Bin
Turn off the power supply
Remove the Front Panel and Insulation Panel
Remove the Base Cover
Expansion Valve Replacement
Preparation
Turn off the power supply
Remove the panels
Refrigerant Handling
Recover the refrigerant and store it in an approved container
Expansion Valve Removal
Remove the insulation and the Expansion Valve Bulb on the suction line
Remove the Expansion Valve Cover
Disconnect the Expansion Valve using brazing equipment
Water From Water-Cooled Condenser Removal
Remove the Front Panel
Move the Control Switch to the 'OFF' position
Wait for 3 minutes
Move the Control Switch to the 'ICE' position
Allow 5 minutes for the icemaker to fill with water and the Water Pump to start operating
Close the Water-cooled Condenser Water Supply Line Shut-off Valve
Open the Drain Valve for the water-cooled condenser water supply line
Allow the line to drain by gravity
Attach compressed air or carbon dioxide supply to the Condenser Water Line Drain Valve
Water From Potable Water Supply Line Replacement
Remove the Front Panel (Except water-cooled model)
Move the Control Switch, on the Control Box, to the “OFF” position
Wait for 3 minutes
Close the Potable Water Supply Line Shut-off Valve and open the Potable Water Supply Line Drain Valve
Allow the line to drain by gravity
Attach compressed air or carbon dioxide supply to the Potable Water Line Drain Valve
Move the Control Switch to the “ICE” position
Blow the potable water line out using compressed air or carbon dioxide
Drier Replacement
Turn off the power supply
Remove the panels
Recover the refrigerant and store it in an approved container
Remove the Drier
Install the new Drier with the arrow in the direction of the refrigerant flow
Check for leaks using nitrogen gas (140 PSIG) and soap bubbles
Evacuate the system and charge it with refrigerant
Replace the panels in their correct positions
Turn on the power supply
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX