MaintainX Asset Hub logo
EnterprisePricing
Buhler

Buhler Cooler ELK500

Need answers fast?
Explore the manual using AI.

Buhler Cooler ELK500
Buhler Cooler ELK500

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Buhler Cooler ELK500

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Buhler Cooler ELK500

Buhler Cooler ELK500

Create an account to install this asset package.

Maintenance Plans for Buhler Cooler Model ELK500

Integrate maintenance plans directly into your work orders in MaintainX.

Coller Maintenance

Check mark

Safety and Maintenance Instructions

Check mark

DANGER: Electrical voltage - Electrocution hazard

Check mark

Disconnect the device from power supply

Check mark

Ensure the equipment cannot be reconnected to mains unintentionally

Check mark

Device opened by trained staff only

Check mark

Correct mains voltage regarded

Check mark

CAUTION: Hot surface - Burning hazard

Check mark

Device cooled down before maintaining

Check mark

CAUTION: High pressure - Risk of injury from ejected parts or oil, environmental hazard from oil

Run this procedureArrow right

Fan Replacement

Check mark

Warning: Ensure the power is disconnected and the fan is secured against restarting

Check mark

Motor disconnected from power and secured against restarting

Check mark

Connecting cable disconnected

Check mark

Fan protected from falling

Check mark

Four connecting screws to the box at the tips of the grate loosened

Check mark

Fan carefully removed out the back

Check mark

New fan inserted in the reverse order

Check mark

When replacing the fan wheel:

Check mark

Retaining screw of the fan installed in the motor shaft

Run this procedureArrow right

Cooler Cleaning

Check mark

Warning: Ensure the cooler matrix is cool and the system is depressurized before starting the cleaning process.

Check mark

Cooler matrix cooled down?

Check mark

Motor disconnected from the mains and secured against accidental restarting?

Check mark

System depressurized and piping to the cooling matrix disconnected?

Check mark

Oil drip pan placed below the cooling matrix?

Check mark

All connections closed with plugs to avoid more oil leaking from the matrix?

Check mark

Cooling matrix protected from falling down?

Check mark

Fan guard with motor and fan wheel removed by unscrewing the 4 fastening screws?

Check mark

Cooling element loosened and removed after removing the four connecting bolts to the box?

Run this procedureArrow right

Cooler Pre Start Check

Check mark

WARNING; Danger due to rotating fan

Check mark

Injuries to the hand may occur

Check mark

Do not reach into the safety guard!

Check mark

NOTICE

Check mark

The device must not be started or operated outside the specifications!

Check mark

NOTICE

Check mark

Abrupt flow variation can lead to pressure peaks that may damage the cooler matrix

Check mark

Make sure that the specifications are not exceeded in this case!

Check mark

Before starting

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Buhler

Explore Other Assets