MaintainX Asset Hub logo
EnterprisePricing
Buhler

Buhler Retentioner AHVA-2000

Need answers fast?
Explore the manual using AI.

Buhler Retentioner AHVA-2000
Buhler Retentioner AHVA-2000

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Buhler Retentioner AHVA-2000

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Buhler Retentioner AHVA-2000

Buhler Retentioner AHVA-2000

Create an account to install this asset package.

Maintenance Plans for Buhler Retentioner Model AHVA-2000

Integrate maintenance plans directly into your work orders in MaintainX.

2 Yearly Shaft Bearing Lubrication

Check mark

Safety Precautions

Check mark

Safety measures

Check mark

Bearing Lubrication

Check mark

Check if bearing needs lubrication

Check mark

Note: The plain bearing assembly has lifelong lubrication and does not need relubricating under normal operating conditions.

Check mark

Conditions for relubricating bearing

Check mark

Sign off on the shaft bearing lubrication

Run this procedureArrow right

6000 Hourly / 1 Yearly Gear Motors Lubrication

Check mark

Replace lubrication distributor (with IEC standard motor attachment only)

Check mark

Perform all maintenance, cleaning and inspection work with the machine at a standstill only (all machine movements have to be stopped)

Check mark

The service or the local switch must be set to 《0》 and locked

Check mark

At least one key of the safety door lock must be removed from the key box

Check mark

Sign off on the gear motors lubrication

Run this procedureArrow right

120 Hourly / 1 Weekly Gear Motors Maintenance

Check mark

DANGER: Explosion hazard! For all maintenance and service work, no explosive atmosphere must exist. Maintenance and service work may only be carried out by qualified, specialist personnel.

Check mark

DANGER: Installation and maintenance work is only to be carried out when the gear train is stationary. The drive must be free of voltage and protected against being switched on inadvertently.

Check mark

Check for leak tightness

Check mark

Check for noise and vibrations

Check mark

Sign off on the gear motors maintenance

Run this procedureArrow right

240 Hourly / 2 Weekly Coupling Maintenance

Check mark

DANGER: Explosion hazard! No explosive atmosphere must exist during maintenance and service work.

Check mark

DANGER: Installation and maintenance work is only to be carried out when the gear train is stationary. The drive must be free of voltage and protected against being switched on inadvertently.

Check mark

Check for wear

Check mark

Is the gear train stationary?

Check mark

Is the drive free of voltage and protected against being switched on inadvertently?

Check mark

Sign off on the maintenance check

Run this procedureArrow right

500 Hourly / 1 Monthly Conditioner Maintenance

Check mark

DANGER: Explosion hazard! For all maintenance and service work, no explosive atmosphere must exist. Maintenance and service work may only be carried out by qualified, specialist personnel.

Check mark

DANGER: Installation and maintenance work is only to be carried out when the gear train is stationary. The drive must be free of voltage and protected against being switched on inadvertently.

Check mark

Check emergency stop button for correct operation

Check mark

Check locking device for correct operation

Check mark

Check residual current circuit breaker for correct operation

Check mark

Check heating mats for correct operation

Check mark

Check axial and radial clearance to housing of mixer and retentioner shaft

Check mark

Check paddles of mixer and retentioner shaft for wear

Check mark

Check retaining bolts of mixer and retentioner

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Buhler

Explore Other Assets