MaintainX Logo
EnterprisePricing
Broce Manufacturing

Broce Manufacturing Road Construction Sweeper RCT350

Need answers fast?
Explore the manual using AI.

Broce Manufacturing Road Construction Sweeper RCT350
Broce Manufacturing Road Construction Sweeper RCT350

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Broce Manufacturing Road Construction Sweeper RCT350

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Broce Manufacturing Road Construction Sweeper RCT350

Broce Manufacturing Road Construction Sweeper RCT350

Create an account to install this asset package.

Maintenance Plans for Broce Manufacturing Road Construction Sweeper Model RCT350

Integrate maintenance plans directly into your work orders in MaintainX.

2 Daily Air Conditioner Preventive Maintenance

Check mark

A well maintained A/C system would save on downtime and premature component failures.

Check mark

Weekly inspections or every 2 days in severe environments should include:

Check mark

Inspect compressor clutch drive belts (tightness, wear)

Check mark

Inspect compressor-mounting brackets (bolts, alignment)

Check mark

Inspect mounting hardware on evaporator unit and condensers

Check mark

Inspect air intake filter. Clean or replace filter

Check mark

Inspect evaporator and condenser coils. Clean using air pressure. (DO NOT USE WATER OR PRESSURE WASHER)

Check mark

Inspect hose and wire harness for proper routing. Leaks and wear

Check mark

Sign off on the air conditioner preventive maintenance

Run this procedureArrow right

2 Yearly Brake Inspection

Check mark

Warning: Do not operate the machine with faulty brakes. This will put the operation in extreme danger and could cause bodily injury and property damage.

Check mark

Does the pedal feel 'spongy'?

Check mark

If the pedal feels 'spongy', there may be air in one or more of the brake lines and must be serviced prior to operating this machine.

Check mark

Check the fluid level in the master cylinder.

Check mark

Inspect brake lines for leaks and/or damage.

Check mark

Replace front and rear brake hoses.

Check mark

Inspect mechanical parking brake linkage for proper adjustment, routing and/or damage.

Check mark

Sign off on the brake inspection

Run this procedureArrow right

4 Hourly Radiator And Heat Exchanger Cleaning

Check mark

Caution: Do not attempt to clean the radiator or heat exchanger while the engine is running. If hands or equipment come in contact with spinning fan blades, serious injury will result. Engine must be completely stopped.

Check mark

Due to the dusty conditions in which this machine operates, the heat exchanger and radiator must be cleaned every 4 to 8 hours of service, depending upon sweeping conditions. If either one becomes clogged with dirt, it will overload the cooling capacity of the other, causing both the engine and hydraulic system to operate at higher than acceptable temperatures. Use water or compressed air directed from the engine side of the radiator to remove dirt build up.

Check mark

Engine completely stopped?

Check mark

Heat exchanger and radiator cleaned?

Check mark

Dirt build up removed from the engine side of the radiator?

Check mark

Radiator and heat exchanger inspected for dirt deposits and/or damage?

Check mark

Sign off on the radiator and heat exchanger cleaning

Run this procedureArrow right

3 Hourly Air Cleaner Maintenance

Check mark

Warning: The air cleaner is one of the most important components of this machine. Due to the extremely dusty conditions in which this machine operates, the air cleaner must be maintained constantly. If the air cleaner is not serviced properly, the machine’s engine life will be reduced.

Check mark

This machine is equipped with a dry type air cleaner, bowl type pre-cleaner, and a restriction type service indicator as standard equipment.

Check mark

Under normal conditions, the air cleaner will need to be serviced every three to four hours. When the clear ring on the Service Indicator turns red, the air cleaner must be serviced immediately.

Check mark

To Service:

Check mark

If the machine is equipped with a dual element air cleaner, DO NOT remove the safety element until you are ready to replace it!

Check mark

DO NOT attempt to clean the safety element! It is strictly a disposable type element.

Check mark

Cleaning:

Check mark

Caution: When using compressed air, clear the area of bystanders, guard against flying debris, and wear personal protection equipment including eye protection.

Check mark

Sign off on the air cleaner maintenance

Run this procedureArrow right

Initial 30 Days Storage Maintenance

Check mark

If storing the Broce Broom for more than 30 days:

Check mark

1. Change engine oil.

Check mark

2. Charge battery and disconnect terminal leads.

Check mark

3. Fill fuel tank and add fuel stabilizer.

Check mark

4. Add small amount of oil into cylinders and crank engine a few times.

Check mark

5. Grease all pivot pins and perform standard lubrication procedures.

Check mark

6. Apply grease to all exposed cylinder rods.

Check mark

7. Retract all cylinder rods.

Run this procedureArrow right

Parts for Broce Manufacturing Road Construction Sweeper RCT350

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Panel Electric

203150

Breaker 150 AMP

307900

Fuse Holder

203669

250 AMP Fuse

203668

Solenoid Control

203670

Panel Electric

203150

Breaker 150 AMP

307900

Fuse Holder

203669

250 AMP Fuse

203668

Solenoid Control

203670

Panel Electric

203150

Breaker 150 AMP

307900

Fuse Holder

203669

250 AMP Fuse

203668

Solenoid Control

203670

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

Explore Other Assets