Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

AMS Controls Open Loop Controller MP350A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial Open Loop Controller Boost Reaction Testing
Preparation
Ensure all safety protocols are in place
Verify that the system is powered on and operational
Boost Reaction Time Adjustment
Record the current BOOST REACTION TIME setting
Is the leading edge of the part pushing the die and deforming its shape?
Is the die causing the material to pull or tear apart?
Adjust the BOOST REACTION TIME accordingly
Verification
Initial Open Loop Controller Stopping Reaction Testing
Preparation
Ensure the following are in place
Stopping Mode Selection
Select the STOPPING MODE
Stopping Reaction Time Configuration
Enter the STOPPING REACTION time (seconds)
Is the STOPPING REACTION time within the acceptable range (0 to 5.000 seconds)?
Testing and Verification
Run a test cycle to verify the STOPPING REACTION time
Initial Open Loop Controller Power Testing
Pre-connection Voltage Check
Measure voltage at the connectors before plugging in
Is the polarity of the 24 VDC correct for panel mount version?
Console Models Voltage Check
Measure 120 VAC from pin J to pin K
Measure 120 VAC from pin J to pin L
Measure 0 VAC from pin K to pin L
Post-connection Power Check
Turn off the power and plug in the connectors
Initial Open Loop Controller Testing
Manual Shear Testing
Activate the shear using the CYCLE switch on the front panel.
Did the SHEAR output turn on for the SHEAR DWELL time or until the SHEAR COMPLETE input switch closed?
Adjustments made to SHEAR DWELL time or SHEAR COMPLETE switch position
Manual Press Testing (With Punching Only)
Activate the punch using the MANUAL PUNCH input.
Did the Punch output turn on for the PUNCH DWELL time or until the PUNCH COMPLETE input switch closed?
Adjustments made to PRESS DWELL time or PRESS COMPLETE switch position
Jogging Verification
Initial Open Loop Controller Press Reaction Testing
Standard PRESS REACTION Time Calculation
Set the PRESS REACTION time to zero
Program a 130" part with holes at 60" and 120"
Cycle the shear and the press
Run the line
Measure the leading edge to the first hole and the first hole to the second hole
Use the formula for the new PRESS REACTION time
Alternative Procedure for Long Distance and Large Scrap
Set initial values
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX