MaintainX Asset Hub logo
EnterprisePricing
American Dryer Corporation

American Dryer Corporation Gas Dryer ML-175

Need answers fast?
Explore the manual using AI.

American Dryer Corporation Gas Dryer ML-175
American Dryer Corporation Gas Dryer ML-175

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for American Dryer Corporation Gas Dryer ML-175

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

American Dryer Corporation Gas Dryer ML-175

American Dryer Corporation Gas Dryer ML-175

Create an account to install this asset package.

Maintenance Plans for American Dryer Corporation Gas Dryer Model ML-175

Integrate maintenance plans directly into your work orders in MaintainX.

90 Daily Gas Dryer Cleaning

Check mark

Lint Removal

Check mark

Remove lint from around basket (tumbler), drive motors, and surrounding areas.

Check mark

Remove lint from the gas valve burner area using a dusting brush or vacuum cleaner attachment.

Check mark

Remove lint accumulation from inside.

Check mark

Lubrication

Check mark

Lubricate impellor (fan/blower) shaft bearings using Shell Alvania grease NLGI 2 or its equivalent.

Check mark

Inspection

Check mark

Check that the setscrews on the impellor/fan shaft bearings are tight.

Check mark

Safety Precautions

Run this procedureArrow right

6 Monthly Gas Dryer Inspection

Check mark

Inspection of Connections and Fasteners

Check mark

Inspect bolts, nuts, screws, setscrews, and grounding connections

Check mark

Inspect nonpermanent gas connections

Check mark

Inspection and Maintenance of Belts

Check mark

Examine fan (impellor) V-belts, motor, and drive belts

Check mark

Replace cracked or seriously frayed belts if necessary

Check mark

Tighten loose V-belts if necessary

Check mark

Operational Check of Controls and Valves

Check mark

Complete operational check of controls and valves

Run this procedureArrow right

Gas Dryer Check

Check mark

Microprocessor Controller (Computer) Board Check

Check mark

Reestablish power to the dryer after installing the replacement microprocessor controller board.

Check mark

Start the drying cycle by pressing any of the preset cycles in letters A-F.

Check mark

Are the applicable indicator lights on the microprocessor controller board lit?

Check mark

Models with Direct Spark Ignition (DSI) Module (Type I) Check

Check mark

Start the drying cycle.

Check mark

Did the gas burner ignite within the 6-second trial for ignition time?

Check mark

Is the flame sensor detecting the gas burner flame?

Check mark

Is the DSI module keeping the gas valve open as long as there is a call for heat?

Run this procedureArrow right

6 Monthly Gas Dryer Check

Check mark

Lint Accumulation Inspection and Removal

Check mark

Inspect and remove lint accumulation in customer furnished exhaust ductwork system.

Check mark

Inspect and remove lint from dryer's internal exhaust ducting.

Check mark

Back Draft Damper Inspection

Check mark

Check customer furnished back draft dampers in the exhaust ductwork for lint accumulation.

Check mark

Inspect and ensure back draft dampers are not binding or sticking.

Check mark

Hi-Limit Reset Procedure

Check mark

Did the hi-limit trip due to a high temperature occurrence?

Check mark

Disconnect power before resetting the hi-limit.

Run this procedureArrow right

Initial 7 Days Gas Dryer Inspection

Check mark

Inspection of Connections and Fasteners

Check mark

Inspect all bolts, nuts, screws, and setscrews

Check mark

Inspect grounding and nonpermanent gas connections

Check mark

Inspection and Maintenance of Belts

Check mark

Examine fan (impellor) V-belts, motor, and drive belts

Check mark

Replace cracked or seriously frayed belts if necessary

Check mark

Tighten loose V-belts if necessary

Check mark

Operational Check

Check mark

Complete operational check of controls and valves

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

Explore Other Assets