

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Amana Heat Pumps PMH154
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Outdoor Maintenance
Outdoor Coil Maintenance
Remove the chassis from the wall sleeve
Capture the refrigerant from the system
Debraze the inlet and discharge tubing from the outdoor coil
Remove all screws from the sides of the outdoor coil securing the shroud to the coil
Press the tabs on the right side of the shroud to separate the shroud from the outdoor coil
For 'E-K' models, separate the four-piece condenser shroud (top, sides, and shroud)
Remove the two screws securing the outdoor coil to the base pan
Carefully lift the outdoor coil over the basepan lip
Escutcheon, Control Board And Control Panel Removal
Front Cover Removal
Remove front cover
Control Board Cover Removal
Remove the two mounting screws from the control board cover
Tilt the control panel out
Disconnect ribbon connector from control board
Control Board Disconnection
Disconnect all wiring to the control board
Label the wires for proper reassembly
Cooling Performance Check
Temperature Recording
Record dry bulb temperature of return air at conditioner (Step A)
Record dry bulb temperature of air leaving conditioner (Step B)
Ensure dry bulb thermometer temperature on sling psychrometer is within ±1°F of return air thermometer reading (Step C)
Record wet bulb temperature on sling psychrometer
Temperature Difference Calculation
Calculate temperature difference by subtracting Step B from Step A
Use Cooling Range Chart to determine cooling range based on calculated temperature difference
Example Verification
Power Cord Maintenance
Front Panel and Control Knobs Removal
Remove the unit front by tilting the bottom of the front outward and then lift the front straight up
Remove the control knobs on the control panel cover by pulling upward on the knobs
Remove the escutcheon
Control Panel Cover Removal
Remove the control panel cover by removing the two screws holding the control panel cover
Tilt the control panel forward to gain access to the wires
Power Cord Disconnection
Remove the power cord clamp located near the bottom right of the chassis
Capacitor Check
Disassembly
Remove front cover
Remove the two mounting screws from the control board cover
Tilt the control panel out and disconnect ribbon connector from control board
Capacitor Disconnection
Disconnect all wiring to the capacitor
Label the wires for proper reassembly
Capacitor Removal
Remove the screw securing the capacitor mounting clamp to the center partition
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













