The ABB Robot Arm IRB 1200-7/0.7 type B is a versatile industrial robotic solution designed for precision tasks in manufacturing. Known for its reliability and efficiency, this robot arm excels in applications such as assembly, welding, and material handling, making it a valuable asset in modern automation environments.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

ABB Robot Arm IRB 1200-7/0.7 type B
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Robot Cabling Inspection
Warning: Ensure all power supplies are turned off before entering the robot working area
Electric power supply to the robot turned off
Hydraulic pressure supply to the robot turned off
Air pressure supply to the robot turned off
Control cabling between the robot and control cabinet visually inspected
Upload a photo of the inspected cabling
Any abrasions, cuts or crush damages detected on the cabling
Was the cabling replaced due to wear or damage
Sign off on the robot cabling inspection
1 Yearly Labels Inspection
Warning: Turn off all electric power supply, hydraulic pressure supply, air pressure supply to the robot, before entering the robot working area.
All power supplies turned off?
Upload a photo of the labels in their current state
All labels present and undamaged?
List any missing or damaged labels
Sign off on the labels inspection
3 Yearly Timing Belts Inspect
Turn off all: electric power supply, hydraulic pressure supply, air pressure supply to the robot, before entering the robot working area.
Access to each timing belt gained by removing the cover
Timing belts checked for damage or wear
Timing belt pulleys checked for damage
Any damage or wear detected?
If any damage or wear is detected, the part must be replaced!
Each belt checked for tension
Is the belt tension correct?
If the belt tension is not correct, adjust it!
Battery Pack Replacement
Preparations before removing the battery pack
1. Move the robot to its zero position.
2. Turn off all:
• electric power supply
• hydraulic pressure supply
• air pressure supply
to the robot, before entering the robot working area.
Removing the battery pack
1. DANGER: Make sure that all supplies for electrical power, hydraulic pressure, and air pressure are turned off.
Mechanical Stops Inspection
Warning: Turn off all power supplies before entering the robot working area
Confirm all power supplies are turned off
Mechanical stops inspection
Replace if the mechanical stop is
Note: The expected life of gearboxes can be reduced as a result of collisions with the mechanical stop.
Sign off on the mechanical stops inspection
Access the parts list for your equipment in MaintainX.
Gearbox Sleeve
3HAC044685-001
Labels And Plate Set
3HAC051417-001
Gearbox
3HAC057904-001
Manipulator Cable Harness Without Ethernet
3HAC056220-001
Tubular Cover
3HAC059708-001
Gearbox Sleeve
3HAC044685-001
Labels And Plate Set
3HAC051417-001
Gearbox
3HAC057904-001
Manipulator Cable Harness Without Ethernet
3HAC056220-001
Tubular Cover
3HAC059708-001
Gearbox Sleeve
3HAC044685-001
Labels And Plate Set
3HAC051417-001
Gearbox
3HAC057904-001
Manipulator Cable Harness Without Ethernet
3HAC056220-001
Tubular Cover
3HAC059708-001
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX