Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
ABB Enclosed Variable Speed/Frequency Drive ACS880-07-0505A-3
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Cleaning the Exterior of the Drive
WARNING! Obey the safety instructions of the drive. If you ignore them, injury or death, or damage to the equipment can occur. If you are not a qualified electrical professional, do not do installation, commissioning or maintenance work.
Drive stopped and electrical safety precautions followed
Select cleaning tools used
Select cleaning solution used
WARNING! Prevent water from entering the drive. Never use excessive amount of water, a hose, steam, etc.
Drive cleaned without water entering
Sign off on the cleaning procedure
6 Yearly ZCU-12 Control Unit Battery Replacement
Warning: For trained personnel only
Drive stopped?
Electrical safety precautions followed?
Upload a photo of the battery ejector in the battery slot
Battery successfully pulled out?
Upload a photo of the new CR2032 battery in the battery holder
Sign off on the battery replacement
9 Yearly Drive Module Main Fan Replacement
WARNING! Obey the safety instructions of the drive. If you ignore them, injury or death, or damage to the equipment can occur. If you are not a qualified electrical professional, do not do installation, commissioning or maintenance work.
Drive stopped and electrical safety precautions followed
Drive module removed from the cabinet
Support legs of the pedestal opened
Two screws that fasten the fan assembly plate undone
Fan assembly plate tilted down
Power supply wires of the fans disconnected
Fan assembly removed from the drive module
Fastening screws of the fan(s) undone and fan(s) removed from the assembly plate
ZCU-12 Memory Unit Replacement
Warning: Do not remove or insert the memory unit when the control unit is powered.
Drive stopped and electrical safety precautions followed
Clip at the side of the memory pulled up
Memory unit removed
Memory unit installed in reverse order
Note: After power-up, the drive will scan the memory unit. This can take several minutes.
Sign off on the memory unit replacement
Cleaning the Interior of the Cabinet
WARNING! Obey the safety instructions of the drive. If you ignore them, injury or death, or damage to the equipment can occur. If you are not a qualified electrical professional, do not do installation, commissioning or maintenance work.
WARNING! Use a vacuum cleaner with antistatic hose and nozzle, and wear a grounding wristband. Using a normal vacuum cleaner creates static discharges which can damage circuit boards.
Drive stopped and electrical safety precautions followed
Cabinet door opened
Interior of the cabinet cleaned using a vacuum cleaner and a soft brush
Air inlets of the fans and air outlets of the modules (top) cleaned
Air inlet gratings (if any) on the door cleaned
Door closed
Sign off on the cleaning procedure
Access the parts list for your equipment in MaintainX.
Fuse IEC
170M6412
Fuse IEC
SC32AR69V800TF
Sine Filter
NSIN0900-6
Fuse IEC
170M6412
Fuse IEC
SC32AR69V800TF
Sine Filter
NSIN0900-6
Fuse IEC
170M6412
Fuse IEC
SC32AR69V800TF
Sine Filter
NSIN0900-6
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX