Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
ABB Adjustable Speed AC Drive ACS550-U1-144A-6
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Heatsink Maintenance
Warning: Always remove power from the drive before starting the maintenance.
Is the heatsink dusty?
If the heatsink is not dusty, no further action is required.
If the heatsink is dusty, proceed with the following steps.
Remove the cooling fan.
Blow clean compressed air (not humid) from bottom to top and simultaneously use a vacuum cleaner at the air outlet to trap the dust.
Note: If there is a risk of the dust entering adjoining equipment, perform the cleaning in another room.
Reinstall the cooling fan.
Restore power.
6 Yearly Main Cooling Fan Replacement
Warning: Only trained personnel should perform this procedure.
Power removed from the drive?
Screw attaching the fan casing removed?
Cable connector disconnected?
Fan replaced onto the casing’s pins?
Casing reinstalled in reverse order?
Power restored?
Sign off on the fan replacement
3 Yearly Internal Enclosure Cooling Fan Replacemnt
Power removed from the drive
Front cover removed
Fan lifted out and cable disconnected
Fan installed in reverse
Power restored
Access the parts list for your equipment in MaintainX.
Fuse
JJS-200
Flange Mounting Kit
AC8-FLNGMT-R6
Ring Lug
YAV6C-L2
Ring Lug
CCL-6-38
Ring Lug
YA4C-L4BOX
Fuse
JJS-200
Flange Mounting Kit
AC8-FLNGMT-R6
Ring Lug
YAV6C-L2
Ring Lug
CCL-6-38
Ring Lug
YA4C-L4BOX
Fuse
JJS-200
Flange Mounting Kit
AC8-FLNGMT-R6
Ring Lug
YAV6C-L2
Ring Lug
CCL-6-38
Ring Lug
YA4C-L4BOX
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX