York Medium Voltage Variable Speed Drive MVVSD08002K-84
York Medium Voltage Variable Speed Drive MVVSD08002K-84

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Medium Voltage Variable Speed Drive MVVSD08002K-84

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Medium Voltage Variable Speed Drive MVVSD08002K-84

York Medium Voltage Variable Speed Drive MVVSD08002K-84

Create an account to install this asset package.

Maintenance Plans for York Medium Voltage Variable Speed Drive Model MVVSD08002K-84

Integrate maintenance plans directly into your work orders in MaintainX.

Drive Assembly

Check mark

Move the sections using a forklift of adequate capacity

Check mark

Lift the enclosure from the slots provided in the channel base on the transformer section

Check mark

Ensure the inverter section is shipped with 4 x 4 posts attached to the bottom

Check mark

Adjust rigging lengths to maintain the enclosure in an upright position

Check mark

Ensure the angle between the lifting cables and vertical does not exceed 45°

Check mark

Ensure ropes or cables do not pass through the holes in lifting angles or eyebolts

Check mark

Use slings with safety hooks or shackles of adequate load rating

Check mark

Bolt together the enclosure sections with 1/2 in. hardware supplied

Check mark

Install and wire the fan assemblies

Run this procedureArrow right

Drive Inspection

Check mark

Initial Inspection

Check mark

Remove any transit packing

Check mark

Inspect the unit to ensure all components have been delivered

Check mark

Check for any visible damage during transit

Check mark

Damage Reporting

Check mark

Is there any damage evident?

Check mark

Note damage on the carrier's freight bill and enter a claim

Check mark

Report major damage to the local Johnson Controls representative

Check mark

Safety Precautions

Run this procedureArrow right

Electrical Insulation Check

Check mark

Preparation

Check mark

Ensure all switches and circuit breakers are opened

Check mark

Disconnect devices not intended for dielectric test

Check mark

Calibrate light or buzzer for breakdown indication

Check mark

Dielectric Testing

Check mark

Perform dielectric test phase-to-ground and phase-to-phase

Check mark

Was the dielectric test performed by qualified personnel?

Check mark

Safety Precautions

Check mark

Refer to safety instructions provided with the test equipment

Run this procedureArrow right

Drive Pre-Installation Check

Check mark

Verify drive specifications

Check mark

Follow all installation safety precautions

Check mark

Is the correct power source available?

Check mark

Check if the installation site meets all environmental specifications for NEMA 1

Check mark

Is the chiller in the correct working condition and ready to be started?

Check mark

Power Factor Correction Capacitors (PFCCs) Check

Check mark

Are PFCCs located on the power source side of the drive?

Check mark

Describe any issues with PFCCs placement

Check mark

Ensure drive positioning allows ample clearance for cabinet doors and accessibility of controls

Run this procedureArrow right

Device and Mechanism Check

Check mark

Device Inspection

Check mark

Check all devices for damage

Check mark

Make necessary repairs or replacements

Check mark

Ensure all safety signs are visible and not obscured

Check mark

Mechanism Operation Check

Check mark

Manually exercise all switches, relays, and other operating mechanisms

Check mark

Check operating mechanisms for correct alignment and free operation

Check mark

Functionality Check

Check mark

Check operating mechanisms for intended function

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.