MaintainX Asset Hub logo
EnterprisePricing
York

York Medium Voltage Variable Speed Drive MVVSD06002K-84

Need answers fast?
Explore the manual using AI.

York Medium Voltage Variable Speed Drive MVVSD06002K-84
York Medium Voltage Variable Speed Drive MVVSD06002K-84

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Medium Voltage Variable Speed Drive MVVSD06002K-84

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Medium Voltage Variable Speed Drive MVVSD06002K-84

York Medium Voltage Variable Speed Drive MVVSD06002K-84

Create an account to install this asset package.

Maintenance Plans for York Medium Voltage Variable Speed Drive Model MVVSD06002K-84

Integrate maintenance plans directly into your work orders in MaintainX.

Drive Pre-Installation Check

Check mark

Drive and Motor Compatibility

Check mark

Is the drive the correct voltage and current rating for the motor being started?

Check mark

Safety and Environmental Checks

Check mark

Ensure all installation safety precautions are followed

Check mark

Is the installation site meeting all environmental specifications for NEMA 1?

Check mark

Power Source Verification

Check mark

Is the correct power source available?

Check mark

Chiller Condition

Check mark

Is the chiller in the correct working condition and ready to be started?

Run this procedureArrow right

Device and Mechanism Check

Check mark

Device Inspection

Check mark

Check all devices for damage

Check mark

Make necessary repairs or replacements

Check mark

Ensure all safety signs are visible and not obscured

Check mark

Mechanism Operation Check

Check mark

Manually exercise all switches, relays, and other operating mechanisms

Check mark

Check operating mechanisms for correct alignment and free operation

Check mark

Functionality Check

Check mark

Check operating mechanisms for intended function

Run this procedureArrow right

Drive Inspection

Check mark

Initial Inspection

Check mark

Remove any transit packing

Check mark

Inspect the unit for component delivery and transit damage

Check mark

Damage Reporting

Check mark

Is there any evident damage?

Check mark

Note damage on the carrier's freight bill and enter a claim

Check mark

Report major damage to the local Johnson Controls representative

Check mark

Safety Precautions

Check mark

Ensure no damaged equipment is installed or energized

Run this procedureArrow right

Drive Assembly

Check mark

Moving and Lifting

Check mark

Use a forklift of adequate capacity to move the sections.

Check mark

Lift the enclosure from the slots provided in the channel base on the transformer section.

Check mark

Ensure the inverter section is shipped with 4 x 4 posts attached to the bottom.

Check mark

Rigging and Lifting

Check mark

Adjust rigging lengths to maintain the enclosure in an upright position.

Check mark

Ensure the angle between the lifting cables and vertical does not exceed 45°.

Check mark

Ensure ropes or cables do not pass through the holes in lifting angles or eyebolts.

Check mark

Use slings with safety hooks or shackles of adequate load rating.

Run this procedureArrow right

Drive Pre-Energization Check

Check mark

Verify MVVSD Ratings

Check mark

Verify MVVSD ratings match system data

Check mark

Check the connections

Check mark

Remove all blocks or temporary braces used for shipment

Check mark

Clean Enclosure

Check mark

Clean out all metal chips, scrap wire, and other debris

Check mark

Is there an appreciable accumulation of dust or dirt?

Check mark

Clean the enclosure using a brush, vacuum cleaner, or a clean lint-free brush

Check mark

Check the integrity of all bus bar supports for secureness and damage

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets