MaintainX Logo
EnterprisePricing
Yokogawa

Yokogawa Transmitter YTA610

Need answers fast?
Explore the manual using AI.

Yokogawa Transmitter YTA610
Yokogawa Transmitter YTA610

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Yokogawa Transmitter YTA610

Yokogawa Transmitter YTA610

Create an account to install this asset package.

Maintenance Plans for Yokogawa Transmitter Model YTA610

Integrate maintenance plans directly into your work orders in MaintainX.

Transmitter Maintenance

Check mark

Each component of this instrument is configured in units to make maintenance easier.

Check mark

This chapter contains disassembly and assembly procedures associated with calibration, adjustment and part replacement required for maintenance of the affected instrument.

Check mark

IMPORTANT

Check mark

1. Maintenance of this instrument should be performed in a service shop where the necessary tools are provided.

Check mark

2. Handling the MAIN and Indicator assembly.

Check mark

Some of the parts contained in the MAIN and Indicator assembly are susceptible to static electricity damage. Before performing maintenance, use a ground wrist band or other antistatic measures, and avoid touching the electronic components and circuits with bare hands.

Run this procedureArrow right

Transmitter Calibration

Check mark

Calibration

Check mark

This instrument is fully factory-tested and is guaranteed for the intended accuracy, eliminating the need for calibration. When calibration needs to be varified, the following equipment and calibration procedure is recommended.

Check mark

To conduct calibration required to evaluate the uncertainty while using the instrument, follow the steps below:

Check mark

1. Connect each equipment, and warm up for 3 minutes or more. Lay wiring on the input side according to the sensor to be used.

Check mark

2. For DC voltage input

Check mark

With a voltage generator, deliver input signals corresponding to 0, 25, 75, or 100% of the input span to the temperature transmitter. Measure the resulting input signal with the voltmeter (digital multimeter) and check the output value relative to the input value.

Check mark

3. For thermocouple input

Check mark

Since this instrument is equipped with a reference junction compensating function, use a reference junction compensating function in universal calibrator in order to compensate for this function upon calibration.

Check mark

According to the reference millivolt table for thermocouple, obtain millivolt corresponding to 0, 25, 50, 75, or 100% of the span, and use that power as the input value, then deliver it from the universal calibrator to the temperature transmitter.

Run this procedureArrow right

Integral Indicator Replacement

Check mark

Replacement of Integral Indicator

Check mark

 Removal of integral indicator

Check mark

1. Remove the cover.

Check mark

2. Remove two nuts while using your hand to support the integral indicator.

Check mark

3. Remove the indicator assembly from the MAIN assembly. At this time, straighten and pull the indicator assembly forward so that the connector connecting the MAIN assembly and the indicator assembly is not damaged.

Check mark

 Mounting the Integral indicator

Check mark

1. Place the Indicator assembly in desired direction over the MAIN assembly.

Check mark

2. Align the mounting hole of the Indicator assembly with the stud bolt hole, and carefully insert the indicator into the connector in a straight manner so that the connector is not damaged.

Check mark

3. Tighten the two nuts that secure the indicator.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Yokogawa

Explore Other Assets