Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Xylem Heat Exchanger 04036-BCF
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Heat Exchanger Scale Inspection
Maintenance
Observe interior and exterior condition for scale build-up
Check for complete stoppage of flow through tubes due to neglect in cleaning
Is there a marked increase in pressure drop or reduction in performance?
Has the unit been checked for air or vapor binding?
Inspect for severe expansion strains, leaking tube joints, and damage to the heat exchanger
Clean exchangers subject to fouling or scaling periodically
Describe any light sludge or scale coating observed on the tubes
Initial Heat Exchanger Startup Check
Operation
Open the vent connections and start to circulate the cold medium only.
Are the passages in the exchanger entirely filled with the cold fluid before closing the vents?
Introduce the hot medium gradually until all passages are filled with liquid, then close vents.
Is the unit slowly brought up to temperature?
Was the operation started gradually?
Ensure no hot fluid is admitted to the unit suddenly when empty or cold.
Ensure the unit is not shocked with cold fluid when hot.
Heat Exchanger Shutdown Maintenance
Operation — Shutdown
Ensure compliance with design specifications
Shut off flow of hot medium first
Is it necessary to stop circulation of cooling medium?
Stop circulation of hot medium if cooling medium is stopped
Drain all fluids to prevent freezing and corrosion
Drain condensate from steam heaters to prevent water hammer
Ensure no pulsation of fluids to prevent vibration and strain
Heat Exchanger Maintenance
Maintenance
Ensure all pressure is off equipment and the unit is drained before opening heads
Remove the bonnets
Inspect all tubes for erosion, corrosion, or foreign material and describe findings
Inspect all anodes for excessive corrosion or scale insulation
Scrape anodes to a bright surface if necessary
Inspect filters to prevent foreign matter from entering the exchanger
Ensure not to blow out heat exchangers with air when operating fluids are flammable or hazardous
Select cleaning method used for heat exchangers
Heat Exchanger Anode Inspection
MAINTENANCE — ANODES
Inspect for renewable anodes or pipe plugs
Check anodes for scale or surface coatings
Ensure pipe plug material is softer than the base part
Verify anodes are inhibiting electrolytic corrosion
Replace anodes if necessary
Document any findings or issues
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX