MaintainX Asset Hub logo
EnterprisePricing
Waters

Waters Photodiode Array Detector 2998

Need answers fast?
Explore the manual using AI.

Waters Photodiode Array Detector 2998
Waters Photodiode Array Detector 2998

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Waters Photodiode Array Detector 2998

Waters Photodiode Array Detector 2998

Create an account to install this asset package.

Maintenance Plans for Waters Photodiode Array Detector Model 2998

Integrate maintenance plans directly into your work orders in MaintainX.

Photodiode Array Detector Maintenance

Check mark

Solvent and Reservoir Maintenance

Check mark

Replace solvent reservoir filters regularly

Check mark

Filter and degas solvents to prolong column life, reduce pressure fluctuations, and decrease baseline noise

Check mark

Detector Shutdown Procedure

Check mark

Flush buffered mobile phases out of the detector with HPLC-grade water

Check mark

Flush with a 5 to 10% methanol solution

Check mark

Check for flow cell maintenance needs

Check mark

Flow Cell Maintenance

Check mark

Flush the flow cell

Run this procedureArrow right

Lamp Replacement

Check mark

Safety Precautions

Check mark

Allow the lamp to cool for 30 minutes before removing it.

Check mark

Power-off the detector before changing the lamp.

Check mark

Wear eye protection that filters ultraviolet light.

Check mark

Keep the lamp in the housing during operation.

Check mark

Lamp Removal

Check mark

Power-off the lamp.

Check mark

Power-off the detector and disconnect the power cable from the rear panel.

Check mark

Allow the lamp to cool for 30 minutes.

Run this procedureArrow right

Fuse Replacement

Check mark

Safety Precautions

Check mark

Power-off the 2998 PDA detector

Check mark

Unplug the 2998 PDA detector

Check mark

Fuse Replacement Steps

Check mark

Power-off the detector and disconnect the power cord from the power entry module

Check mark

Pinch the sides of the spring-loaded fuse holder, located above the power entry module on the rear panel of the detector

Check mark

Withdraw the spring-loaded fuse holder with minimum pressure

Check mark

Remove and discard the fuses

Check mark

Ensure new fuses are properly rated

Run this procedureArrow right

Flow Cell Replacement

Check mark

Ensure all required materials are available

Check mark

Preparation

Check mark

Power-off the detector

Check mark

Stop the solvent flow

Check mark

Remove Existing Flow Cell

Check mark

Lift up the detector front cover and pull the front cover from the detector chassis

Check mark

Disconnect the detector's inlet tubing from the column outlet connection

Check mark

Remove the flow cell using a 1/4-inch flat-blade screwdriver to loosen the three thumbscrews on the flow cell assembly's front plate

Check mark

Grasp the handle and gently pull the flow cell toward you

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

Explore Other Assets