

The Toyota Forklift 30-5FBC25 is a reliable industrial asset designed for efficient material handling. Known for its robust performance and durability, this forklift model is ideal for various warehouse and construction applications, ensuring optimal productivity and safety in operations.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Toyota Forklift 30-5FBC25
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2000 Hour / 12 Month Maintenance
Retighten differential bolt or nut looseness
Retighten transmission bolt or nut looseness
Inspect cracks, damage and deformation of housing in front axle
Inspect cracks, damage and deformation of beam in rear axle
1000 Hour / 6 Month Maintenance
Inspect brush wear and sliding contact status of the motor
Inspect motor commutator fouling and damage
Clean hydraulic oil tank and oil strainer
Replace hydraulic oil
Replace brake fluid
Sign off on the 1000 Hour / 6 Month Maintenance
2 Year Replacement
Power steering hoses replaced
Internal rubbers parts of power steering system replaced
Reserve tank hose replaced
Material handling hose replaced
Note: Replace chain every 3 years
Sign off on the 2 Year Replacement
2000 Hour / 12 Month Steering System Maintenance
Inspect damage of power steering hose
Inspect cracks and deformation in knuckle
Measure wheel alignment
Measure left turning angle
Measure right turning angle
Sign off on the steering system maintenance
500 Hour / 3 Month Electrical System Inspection
Motor Insulation resistance
Battery Insulation resistance
Operating voltage of the charger
Access the parts list for your equipment in MaintainX.
Drive Shaft Dust Seal Replacer
09411-41800-71
Steerlng Gear Box Replacer
09620-30010
Snap Ring Expander
09905-00012
Bar Remover & Replacer
09160-10170-71
Chain Wear Scale
09631-22000-71
Drive Shaft Dust Seal Replacer
09411-41800-71
Steerlng Gear Box Replacer
09620-30010
Snap Ring Expander
09905-00012
Bar Remover & Replacer
09160-10170-71
Chain Wear Scale
09631-22000-71
Drive Shaft Dust Seal Replacer
09411-41800-71
Steerlng Gear Box Replacer
09620-30010
Snap Ring Expander
09905-00012
Bar Remover & Replacer
09160-10170-71
Chain Wear Scale
09631-22000-71
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













