MaintainX Asset Hub logo
EnterprisePricing
Total Gym

Total Gym Rehabilitation Exercise System 7450-B1

Need answers fast?
Explore the manual using AI.

Total Gym Rehabilitation Exercise System 7450-B1
Total Gym Rehabilitation Exercise System 7450-B1

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Total Gym Rehabilitation Exercise System 7450-B1

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Total Gym Rehabilitation Exercise System 7450-B1

Total Gym Rehabilitation Exercise System 7450-B1

Create an account to install this asset package.

Maintenance Plans for Total Gym Rehabilitation Exercise System Model 7450-B1

Integrate maintenance plans directly into your work orders in MaintainX.

Roller Removal

Check mark

Remove the M6 screws from the rail endcaps

Check mark

Roll the seat and foot platform off the rails

Check mark

Remove the rollers

Check mark

Unscrew the bolt from the roller

Check mark

Replace the rollers and reinstall the bolt and nut

Check mark

Return the foot platform and seat to the unit

Check mark

Replace the endcaps on the rails

Check mark

Tools required for the procedure

Run this procedureArrow right

1 Daily Rehabilitation Exercise System Maintenance

Check mark

Cleaning and Maintenance

Check mark

Clean rail surfaces with a noncorrosive cleaner or dry towel.

Check mark

Clean all other parts with a noncorrosive cleaner or antibacterial wipes.

Check mark

Wipe down all padded surfaces with antibacterial cleanser after each use.

Check mark

Wipe down the ELEVATE Row ADJ with a clean cloth.

Check mark

Inspection and Functionality Check

Check mark

Is there any visible damage to the ELEVATE Row ADJ?

Check mark

Check the following wear items for damage

Check mark

Does the glideboard move smoothly up and down the rails?

Run this procedureArrow right

Band Replacement

Check mark

Adjust the rail height to highest level

Check mark

Unhook the bungees from the two hooks

Check mark

Get under the rail and loosen the nut on the end of the cable to release tension

Check mark

Loosen and remove the screw on the pulley using a 6mm hex wrench

Check mark

Replace the screw, bracket, and pulley with the new band and tighten the screw

Check mark

Attach the cable back and tighten the nut

Check mark

Check that all parts are securely fastened

Check mark

Test the band replacement by operating the equipment

Check mark

Clean the work area after completion

Run this procedureArrow right

1 Weekly Rehabilitation Exercise System Maintenance

Check mark

Cleaning Procedures

Check mark

Wipe down rails with a noncorrosive, no alkaline, no alcohol cleanser.

Check mark

Clean all surface areas for aesthetics.

Check mark

Wipe down your ELEVATE Row ADJ with a clean cloth.

Check mark

Inspection and Maintenance

Check mark

Check for wear and damage on the following items

Check mark

Are all screws and fasteners installed correctly and tightened?

Check mark

Inspect all pads, fabric or foam for punctures or wear and replace as needed.

Check mark

Safety Precautions

Run this procedureArrow right

1 Monthly Rehabilitation Exercise System Maintenance

Check mark

Cleaning and Maintenance

Check mark

Clean rail surfaces with a noncorrosive cleaner

Check mark

Clean all other parts with a noncorrosive cleaner or antibacterial wipes

Check mark

Wipe down the ELEVATE Row ADJ with a clean cloth

Check mark

Inspection

Check mark

Visually inspect the rollers and clean any debris accumulated on them

Check mark

Inspect rubber stoppers, bungee, and computer for any damage

Check mark

Cautionary Measures

Check mark

Ensure no lubricants or silicone-based products are used on the rails or wheels

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

Explore Other Assets